FIR15-00257
| INSP-Sprinkler Rough-in | 5/4/2015 | 5/4/2015 | 5/4/2015 3:18:32 PM | P | CANC |
|
|
Pat-underground Phone #: ###-#### Inspection cancelled from web by: Stan Beus
|
FIR15-00256
| INSP-Sprinkler Rough-in | 5/4/2015 | 5/4/2015 | 5/4/2015 3:17:21 PM | P | CANC |
|
|
Pat-underground Phone #: ###-#### Inspection cancelled from web by: Stan Beus
|
BLD14-03504
| FIRE-Final Inspection | 5/1/2015 | 5/4/2015 | 5/4/2015 2:48:45 PM | A | PART |
|
|
The previous TCO still stands except it can be modified to allow patients and staff. Waiting for the project related fire alarm permit to be finaled-temp ok
|
FIR15-00058
| INSP-Final Inspection | 5/1/2015 | 5/4/2015 | 5/4/2015 2:47:35 PM | P | FAIL |
|
|
Tested the two new smoke detectors. Can final when the plan modifications have been field verified.
|
FIR15-00231
| INSP-Sprinkler Rough-in | 5/4/2015 | 5/4/2015 | 5/4/2015 1:56:46 PM | P | PASS |
|
|
Rough-in passed. Piping is ok to cover.
|
FIR14-00902
| INSP-Final Inspection | 5/4/2015 | 5/4/2015 | 5/4/2015 1:55:53 PM | P | FAIL |
|
|
Flow switch kept sticking and appears to need replacing.
|
BLD13-01449
| FIRE-Final Inspection | 5/1/2015 | 5/4/2015 | 5/4/2015 9:32:14 AM | A | PASS |
|
|
life safety passed
|