Inspections for the day of: Wednesday, May 4, 2016.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01103 General Inspection5/4/20165/4/20165/5/2016 2:33:55 PM PASS
WIP. Some minor trackout from site needs to be swept during regular housekeeping. No discharges from site. DI in front of project has sediment filter bag installed.
ESC15-00660 General Inspection5/4/20165/4/20165/4/2016 3:20:44 PM PASS
No sediment or other material leaving site. HIllside vegetation has been preserved. Approved.
ESC14-00809 DOC - Permit Finaled5/4/20165/4/20165/4/2016 3:00:03 PMPPASS
ESC13-01279 General Inspection5/4/20165/4/20165/4/2016 2:47:36 PM PASS
Subdivision BMPs installed. Individual SFHs have permit signs posted and are in compliance. No corrections issued.
ESC15-00745 General Inspection5/4/20165/4/20165/4/2016 2:36:20 PM NR
No activity or staging at site at this time
ESC14-00888 General Inspection4/29/20165/4/20165/4/2016 2:35:50 PMAPART
Frame of building is complete, interior and exterior finishes in progress. Parking area and site improvements have not yet started and open areas being utilized for staging.

Lined concrete/liquid waste washout pit provied, designated construction entrance, and storm drain inlet sediment protection is installed.

Corrections needed:

- sweep Belmont street and gutters along project
- conduct maintenance on the DI bag adjacent to construction entrance.
ESC15-00915 DOC - Permit Finaled5/4/20165/4/20165/4/2016 1:52:31 PMPPASS
ESC15-00499 Site Final5/4/20165/4/20165/4/2016 12:59:16 PMPPASS
Temp BMPs and extra stockpile to south of site Del Taco have been removed. Restaurant is open and landscaped. ESC permit conditons satisfied.
ESC16-00168 General Inspection5/4/20165/4/20165/4/2016 12:57:03 PMPPASS
Grading and re-distribution of fill is on-going at site. No fugitive dust observed at time of inspection.

Rock construction entrance and permit sign are located at Victory Rd. No trackout from site.

Irrigation canal lining is installed and is allowing the ditch to travel through site without increasing sediment. Wetland material that was dredged has been stockpile to preserve seed and wetland soils. New wetland mitigation will include this material. Requested that site should check with wetlands specialist to see if stockpile should be kept moist.

No violations at site. Requested some minor maintenance on irrigation ditch lining at south property line.
ESC15-00794 Aging Inspection5/4/20165/4/20165/4/2016 11:58:34 AM PASS
ESC16-00202 Random Inspection5/4/20165/4/20165/4/2016 11:10:25 AMPPASS
WIP. No trackout or sediment leaving site. Sidewalks and gutters are clean and have been swept. Sediment control inlet protection installed at Kootenai
ESC15-00942 General Inspection5/4/20165/4/20165/4/2016 10:13:26 AM PASS
Work complete. Surrounding area still utilized as staging area for project on adjacent parcel. Temp BMPs still installed. Will monitor for final clean up and temp BMP removal
ESC15-01039 Aging Inspection5/4/20165/4/20165/4/2016 9:07:56 AM PASS
ESC15-01041 Aging Inspection5/4/20165/4/20165/4/2016 9:07:20 AM PASS
ESC15-01161 General Inspection5/4/20165/4/20165/4/2016 8:19:36 AM CANC
rescheduled for 5/5