Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00278 INSP-Sprinkler Rough-in5/4/20185/4/20185/4/2018 1:04:17 PMPPART
Rough to cover inspection for overhead fire sprinkler piping above hardlids complete, hardlids approved for cover.

Tom Phone #: ###-####
BLD17-00587 FIRE-Final Inspection5/3/20185/4/20185/4/2018 11:38:57 AMAPASS
Previously noted items have been corrected, no fire sprinkler, no fire alarms, fire exitnguishers are in place with current inspection tags, final life fire safety inspetion complete.

Final Fire Re-inspection. Call for door access if not open. Thanks. Phone #: ###-#### Inspection requested via web by David Rogers
FIR18-00256 INSP-Sprinkler Rough-in/Hydro5/2/20185/4/20185/4/2018 11:05:37 AMADONE
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at contractor provided gauge.

Phone #: ###-#### Inspection requested via web by Matthew Lewis
FIR18-00256 INSP-Final Inspection5/2/20185/4/20185/4/2018 10:54:12 AMACANC
Final fire sprinkler inspection for dry system cannot be completed until 24 hour air test is perfromed and passed, this request is cancelled.

Phone #: ###-#### Inspection requested via web by Matthew Lewis
FIR16-00675 INSP-Sprinkler Rough-in/Hydro5/3/20185/4/20185/4/2018 10:25:29 AMADONE
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauge.

Phone #: ###-#### Inspection requested via web by Sam Ball
FIR16-00684 INSP-Sprinkler Rough-in/Hydro5/3/20185/4/20185/4/2018 10:25:11 AMADONE
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauge.

Phone #: ###-#### Inspection requested via web by Sam Ball
FIR16-00683 INSP-Sprinkler Rough-in/Hydro5/3/20185/4/20185/4/2018 10:24:52 AMADONE
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauge.

Phone #: ###-#### Inspection requested via web by Sam Ball
FIR18-00263 INSP-Final Inspection5/3/20185/4/20185/4/2018 10:11:01 AMAPASS
Final inspection for AES communicator complete.

BSD Bus Terminal final inspection with Peter Namouv from Crane Alarm. Phone #: ###-#### Inspection requested via web by Laura Tyson
BLD18-00470 FIRE-Final Inspection5/3/20185/4/20185/4/2018 9:05:42 AMAPASS
Previously noted items have been completed, no fire sprinklers, no fire alarms, fire extinguisher is in place with a current inspection tag. Final life fire safety inspection complete.

Barb-can you please call with an approx meet time Phone #: ###-####
FIR18-00323 INSP-Final Inspection5/4/20185/4/20185/4/2018 8:43:05 AMAPASS
Final fire sprinkler inspection for scope of work complete.
FIR18-00323 INSP-Sprinkler Rough-in5/3/20185/4/20185/4/2018 8:30:19 AMAPASS
Rough to cover inspection for overhead fire sprinkler piping in scope of work complete, approved for cover.
FIR18-00208 INSP-Sprinkler Rough-in5/3/20185/4/20185/4/2018 8:19:43 AMAPART