ELE20-00676
| Final | 5/1/2020 | 5/4/2020 | 5/4/2020 1:48:10 PM | A | NR |
|
|
garage code 1957e Phone #: ###-#### Inspection requested via web by Alan Lusk Inspected appprox 10 am, called contact about issue with smoke detectors, drove by after 1 am to check smokes which had not been repaired yet. will check back in am.
|
ELE20-00453
| Electrical Rough-In | 5/4/2020 | 5/4/2020 | 5/4/2020 12:48:42 PM | P | PASS |
|
|
under tile floor heat in master bathroom, call for access Phone #: ###-#### Inspection requested via web by steve sellers Floor heat rough in ok cover
|
ELE20-01069
| Electrical Rough-In | 5/1/2020 | 5/4/2020 | 5/4/2020 12:09:29 PM | P | CANC |
|
|
Late afternoon please Phone #: ###-#### >> Inspection requested via web by Kerri Hamilton Inspection cancelled from web by: Kerri Hamilton
|
ELE19-04389
| Electrical Rough-In | 5/1/2020 | 5/4/2020 | 5/4/2020 10:17:52 AM | A | PASS |
|
|
Please contact Trace Carson (electrician) with any questions. Go to 1710 W. Franklin the building is behind this address. Phone #: ###-#### Inspection requested via web by A.M.E. Office ADU Wiring- 300.4(G)- an insulating bushing shall be installed on connectors containing #4 or larger conductors. 1/0 SER connectors. ADU rough in ok cover.
|
ELE20-01510
| Temporary Service | 5/1/2020 | 5/4/2020 | 5/4/2020 9:38:08 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested vias web by Bonnie Page * Alternative method used- #6 copper installed, Required to be #4 minimum. * Signage required stating altermative method used. Contact stated would drive a ground rod t correct.
|
ELE20-01497
| Rough-In Permanent Service | 5/1/2020 | 5/4/2020 | 5/4/2020 8:55:30 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Troy Ballard Rough in ok cover p/s u/g n ok
|