ELE19-04613
| Final | 5/1/2020 | 5/4/2020 | 5/4/2020 2:22:49 PM | P | NR |
|
|
screened // Richard Phone #: ###-####
|
ELE19-04386
| Final | 5/4/2020 | 5/4/2020 | 5/4/2020 2:02:03 PM | P | NR |
|
|
William Phone #: ###-####
|
ELE19-04783
| Final | 5/4/2020 | 5/4/2020 | 5/4/2020 1:42:35 PM | P | PASS |
|
|
Garage code 6365 Phone #: ###-#### Inspection requested via web by Dan Rohl Ok final.
|
ELE20-00806
| Electrical Rough-In | 5/4/2020 | 5/4/2020 | 5/4/2020 12:39:10 PM | P | PASS |
|
|
Floor heat in master bath Phone #: ###-#### Inspection requested via web by Therrin Robertson Ok cover floor heat mstr.
|
ELE20-01336
| Final | 5/1/2020 | 5/4/2020 | 5/4/2020 12:38:44 PM | A | PASS |
|
|
Need final for pool and disconnecct for future spa. Spa will not be installed at this time or on this permit. please call Caleb with any questions or concerns. Phone #: ###-#### Inspection requested via web by Caleb Gaylord Ok final.
|
ELE20-01502
| Electrical Rough-In | 5/1/2020 | 5/4/2020 | 5/4/2020 10:38:23 AM | A | PASS |
|
|
this is Miguel sandoval journeyman responsible for this jobs, I would like to be there with you at the inspection so I can walk you through on what we did in this project, can you please give me 1 hr heads up ,, my number is 208- ###-#### Phone #: ###-#### Inspection requested via web by Greg Traudt Ok cover panel wall, small wall across from up bath, basement bath and all basement ceiling.
|
ELE20-00080
| Final | 5/1/2020 | 5/4/2020 | 5/4/2020 10:10:00 AM | A | PASS |
|
|
House is not occupied-owner Ric will be there working ( 208)###-#### Phone #: ###-#### Inspection requested via web by Chris Husted Ok final.
|
ELE20-01514
| Electrical Rough-In | 5/2/2020 | 5/4/2020 | 5/4/2020 10:09:37 AM | A | PASS |
|
|
bonding inspection Phone #: ###-#### Inspection requested via web by Nick Larson Ok cover. 4 corners bonded. Perimeter will not be concrete surface. EQ plane, when done, will need to be between 4"-6" deep for inspection.
|