BLD99-02613
| BLD-Framing/Rough-in | 5/4/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | A | PART |
|
|
Larry ###-#### Need spec. insp. reports & sprinkler R/I @ front WIP 5/8/00 9:36:30 AM
|
BLD00-00343
| BLD-Footing | 5/4/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | A | PART |
|
|
###-#### MTI onsite? unable to access, bldg. locked. 5/8/00 9:37:49 AM
|
BLD00-00736
| BLD-Framing/Rough-in | 5/4/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | A | PART |
|
|
###-#### Ok to side. 5/8/00 9:37:19 AM
|
BLD99-02963
| BLD-Final | 5/4/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | A | PASS |
|
|
###-#### CALL FIRST L/C issued. 5/8/00 9:36:12 AM
|
BLD99-02086
| BLD-Foundation | 5/4/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | A | PART |
|
|
###-#### Poured, appears ok. 5/8/00 9:38:14 AM
|
BLD99-02085
| BLD-Framing/Rough-in | 5/4/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | A | PART |
|
|
###-#### Ext. shear walls- tighten nailing to 4" occ. 5/8/00 9:38:06 AM
|
BLD99-03295
| BLD-Final | 5/2/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | A | FAIL |
|
|
###-#### Shawn call first please Not a "final", excavation ok. 5/8/00 9:37:33 AM
|
BLD00-00818
| BLD-Framing/Rough-in | 5/3/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | A | FAIL |
|
|
###-#### C/N N/R; no plans or other inspe- $42.00 next time N/R 5/8/00 9:36:55 AM
|
MEC00-01000
| Conference | 5/3/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/03/2000 at 12:45:55. Contact: . Record shows finalled by 350 5-3-00 ok. 5/8/00 9:37:12 AM
|
MEC00-01430
| Rough-in | 5/4/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | A | FAIL |
|
|
Shane ###-#### C/N: support, gas pipe, complete dryer vent, etc. 5/8/00 9:35:51 AM
|
BLD00-00393
| BLD-Final | 5/4/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | P | FAIL |
|
|
gess ###-#### fn occ N/R 5/9/00 11:25:00 AM
|
BLD00-00888
| BLD-Energy code compliance | 5/3/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | P | PART |
|
|
###-#### Floor insul? chk @ final. 5/9/00 11:26:16 AM
|
MIS00-00127
| BLD-Final | 5/5/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | P | FAIL |
|
|
###-#### carol $42.00 fee due prior to reinsp. 5/9/00 11:26:38 AM
|
BLD00-00680
| BLD-Framing/Rough-in | 5/5/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/05/2000 at 09:58:21. Contact: . C/N- overspan rafters, elec. service entrance. 5/9/00 11:27:57 AM
|
BLD00-00988
| BLD-Framing/Rough-in | 5/5/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | P | PART |
|
|
###-#### Reinsp. ok- has low (1:12) slope roof, advised to check w/manuf. or use membrane 5/9/00 11:26:02 AM
|
MEC00-01465
| Rough-in | 5/5/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | P | FAIL |
|
|
TONYA ###-#### R/I Unable to contact; N/R? 5/9/00 11:25:26 AM
|
BLD00-00919
| BLD-Conference | 5/5/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | P | PASS |
|
|
w/Bldr. -Mucho eng'g.
|
MIS00-00081
| BLD-Conference | 5/5/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | P | PASS |
|
|
W/Mike Otto re: "Daycare" mis permit policy.
|
BLD00-00477
| BLD-Final | 5/4/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/04/2000 at 18:19:12. Contact: ###-####. Need other finals. 5/8/00 9:35:35 AM
|
BLD00-00799
| BLD-Framing/Rough-in | 5/5/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | P | FAIL |
|
|
###-#### Need eng's letter re: shear walls, keep C/N, talked to supt. 5/8/00 9:32:53 AM
|
MEC00-00575
| Final | 5/5/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | P | PASS |
|
|
rebecca or brandi--###-#### re-insp fn C/N ok 5/8/00 9:32:41 AM
|
BLD00-00674
| BLD-Foundation | 5/5/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | P | PART |
|
|
Jed ###-####
|
BLD98-00209
| BLD-Final | 5/5/2000 | 5/5/2000 | 5/4/2000 12:00:00 AM | P | FAIL |
|
|
Occupancy violation issued.
|