BLD00-00841
| FIRE-Final Inspection | 5/4/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | A | PASS |
|
|
John Crow ###-####
|
BLD99-02437
| FIRE-Final Inspection | 5/4/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | A | FAIL |
|
|
matt ###-#### Sprinkler final- C/N issued. 5/11/00 10:50:40 AM
|
BLD00-00536
| FIRE-Final Inspection | 5/4/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/04/2000 at 10:37:56. Contact: ###-####.
|
FIR99-00654
| INSP-Sprinkler Rough-in/Hydro | 5/5/2000 | 5/5/2000 | 5/5/2000 12:00:00 AM | A | FAIL |
|
|
overspacing; cages for heads under stairs; lighting room needs additional head; 2nd floor by stair head within 4 inches of wall; calc and FM tag on riser; high temp head needed near heater on 2nd floor
|