BLD05-00182
| BLD-Aging Inspection | 5/5/2005 | 5/5/2005 | 5/6/2005 10:38:54 AM | P | NR |
|
|
I spoke to Paul Marcolina about status. He was going to find out why sprinkler permit and life safety had not been finaled yet.
|
FIR04-00750
| FIR-Aging Inspection | 5/5/2005 | 5/5/2005 | 5/6/2005 10:19:39 AM | | NR |
|
|
work in progress
|
BLD05-00368
| FIRE-Final Inspection | 5/4/2005 | 5/5/2005 | 5/5/2005 4:10:41 PM | P | CANC |
|
|
###-#### shane Per Bill Alexander, this permit can be finaled when construction under the other building permit has started.
|
FIR05-00112
| INSP-Sprinkler Rough-in/Hydro | 5/4/2005 | 5/5/2005 | 5/5/2005 4:10:38 PM | P | CANC |
|
|
The fdc wasn't included in the hydro test. Mike said he would change that and call it in for tomorrow
|
FIR04-00768
| INSP-Alarm Testing | 5/4/2005 | 5/5/2005 | 5/5/2005 4:10:36 PM | A | PART |
|
|
Tested initiating devices on the first floor. This includes smokes, pulls and sprinkler devices. Need to test heat detectors, verify ceiling a/v's are listed for ceiling, add a/v in the electrical room and get the addresses straightened out.
|
FIR05-00235
| INSP-Final Inspection | 5/5/2005 | 5/5/2005 | 5/5/2005 10:59:36 AM | P | PASS |
|
|
Fire sprinkler passed
|
FIR05-00067
| INSP-Final Inspection | 5/4/2005 | 5/5/2005 | 5/5/2005 10:31:16 AM | A | PASS |
|
|
fire sprinkler passed
|
FIR04-00737
| INSP-Sprinkler Rough-in | 5/4/2005 | 5/5/2005 | 5/4/2005 1:36:35 PM | A | FAIL |
|
|
Inspection was for the area under the mezzanine as shown on the resubmitted plans. Plans do not show the upright heads for the combustible concealed space. There are six uprights mounted above the pendants. They are 200 degree QR brass uprights.
|