Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00606 INSP-Sprinkler Rough-in5/2/20085/5/20085/8/2008 9:06:27 AMAFAIL
Rough-in inspection for the second floor areas J and I failed due to several items including incorrect seismic bracing, lacking clearance at mains and block wall penetrations, overspaced hangers, beam clamp retatining straps not attatched, pipe routing has been changed from approved plans at some locations including mains and branch lines as red lined on plans, hard lid ceilings at the restrooms have been installed without a cover inspection-need to provide access, stairways and electrical rooms are not yet completed, piping at the storage areas under the stair landings 1st floor does not match plan and SW heads installed are too low, several added branch line hangers at the first floor classroom wings are missing retaining strap attatchment.
FIR06-00595 INSP-Final Inspection5/5/20085/5/20085/6/2008 11:21:14 AMADEFR
See inspection comments dated 5/6.
BLD07-01778 FIRE-Final Inspection5/5/20085/5/20085/5/2008 3:36:18 PMPPASS
Acceptable per G. Slane
BLD08-00045 FIRE-Final Inspection5/5/20085/5/20085/5/2008 2:24:18 PMPPASS
Fire life safety finaled
FIR08-00264 INSP-Final Inspection5/5/20085/5/20085/5/2008 2:23:18 PMPDEFR
raul Phone #: ###-#### Inspection rescheduled 5/6
BLD08-00045 FIRE-Final Inspection5/5/20085/5/20085/5/2008 2:04:08 PMPPART
Need to repair one exit sign non-functional on battery backup at the back hallway, remainder of fire life safety passed.
FIR08-00236 INSP-Final Inspection5/2/20085/5/20085/5/2008 2:01:28 PMPPART
Overhead fire sprinkler system modifications are approved per the scope of new work, however the existing upright heads at the remainder of the same fire area (spray booth) are in need of replacement due to excessive build-up of paint residue at the head elements and seats. Permit final pending completion of this work.
FIR08-00277 INSP-Final Inspection5/2/20085/5/20085/5/2008 1:52:27 PMAPASS
Fire sprinkler modifications per the scope of permit work passed inspection.
BLD06-01538 FIRE-Final Inspection5/2/20085/5/20085/5/2008 12:29:09 PMAFAIL
One smoke alarm at the second floor hallway at unit 2175 needs to be relocated due to proximity to the HVAC grill, skylight, and location closer than 3' to the bathroom door containing a shower-see fire code review notes for requirements, retested smoke alarm at unit 2173 repaired okay, remainder of life safety issues are acceptable.
BLD07-03282 FIRE-Sprinkler Rough-in5/5/20085/5/20085/5/2008 12:06:43 PMPNR
Rocky Phone #: ###-####--Forrest please talk to Rocky regarding this inspection
BLD06-03323 FIRE-Final Inspection5/5/20085/5/20085/5/2008 11:49:26 AMPPASS
Fire life safety finaled.
FIR07-00326 INSP-Final Inspection5/5/20085/5/20085/5/2008 11:48:51 AMAPASS
Fire alarm work passed field inspection, permit finaled.
FIR07-01041 INSP-Sprinkler Rough-in/Hydro5/2/20085/5/20085/5/2008 11:48:04 AMAPART
OH rough-in is approved for cover at the drop ceilings for the remainder of install as marked and initialed with today's date on approved plan set.
FIR07-00863 INSP-Sprinkler Rough-in/Hydro5/2/20085/5/20085/5/2008 10:50:34 AMACANC
Overbooked
FIR08-00162 INSP-Final Inspection5/2/20085/5/20085/5/2008 10:50:14 AMACANC