FIR08-00204
| INSP-Sprinkler Rough-in | 4/30/2008 | 5/5/2008 | 5/5/2008 4:26:51 PM | A | PART |
|
|
The underground piping is ok to cover. The piping installed is 2" PVC. The contractor wanted the overhead rough-in performed but did not have the city approved plans on site. No overhead inspection was done.
|
FIR07-00929
| INSP-Final Inspection | 5/2/2008 | 5/5/2008 | 5/5/2008 3:35:06 PM | A | PASS |
|
|
Permit finaled. Storage has been removed from the top of the couch storage bins.
|
FIR08-00122
| INSP-Final Inspection | 5/2/2008 | 5/5/2008 | 5/5/2008 3:34:07 PM | A | PASS |
|
|
Permit finaled
|
BLD07-02197
| FIRE-Final Inspection | 5/2/2008 | 5/5/2008 | 5/5/2008 1:36:10 PM | A | PASS |
|
|
Life safety passed. The additional smoke detector outside of the ground floor bedroom has been added.
|
BLD07-02171
| FIRE-Final Inspection | 5/2/2008 | 5/5/2008 | 5/5/2008 1:35:51 PM | A | PASS |
|
|
Life safety passed. The additional smoke detector outside of the ground floor bedroom has been added.
|
BLD07-02188
| FIRE-Final Inspection | 5/2/2008 | 5/5/2008 | 5/5/2008 1:35:31 PM | A | PASS |
|
|
Life safety passed. The additional smoke detector outside of the ground floor bedroom has been added.
|
BLD07-02159
| FIRE-Final Inspection | 5/2/2008 | 5/5/2008 | 5/5/2008 1:34:59 PM | A | PASS |
|
|
Life safety passed. The additional smoke detector outside of the ground floor bedroom has been added.
|
BLD08-00908
| FIRE-Final Inspection | 5/2/2008 | 5/5/2008 | 5/5/2008 12:09:49 PM | A | PART |
|
|
A temporary occupancy was given until the keyed dead bolt from the interior door that separates the two spaces has been removed and approved hardware as discussed is installed on the secondary exterior door.
|
FIR08-00196
| INSP-Final Inspection | 5/2/2008 | 5/5/2008 | 5/5/2008 11:49:56 AM | A | PASS |
|
|
Permit finaled
|
BLD08-00284
| FIRE-Final Inspection | 5/2/2008 | 5/5/2008 | 5/5/2008 10:55:13 AM | A | FAIL |
|
|
Provide approved hardware on the two north facing warehouse exit doors as discussed. All other items are ok.
|