ESC08-00327
| Site Preparation | 5/2/2008 | 5/5/2008 | 5/5/2008 3:04:48 PM | A | PART |
|
|
Work has not started but are getting set up for start. Sign is posted. Left mesage for RP. CAS #460
|
ESC07-00983
| Site Final | 5/5/2008 | 5/5/2008 | 5/5/2008 2:09:35 PM | P | PASS |
|
|
Site is fully landscaped and hydro seeding has been sprayed on all distrurbed soils. RP will remove all D.I. protection today at the end of the day. CAS #460
|
ESC07-00573
| BMP Violation | 5/5/2008 | 5/5/2008 | 5/5/2008 1:42:25 PM | P | FAIL |
|
|
Since site final the Temporary BMP's have not all been Removed. Talked with RP to remove them as soon as possible. CAS #460
|
ESC07-01274
| Random Inspection | 5/5/2008 | 5/5/2008 | 5/5/2008 1:14:33 PM | A | CANC |
|
|
|
ESC07-01520
| Random Inspection | 5/5/2008 | 5/5/2008 | 5/5/2008 10:26:36 AM | A | PART |
|
|
Sediment in project area needs to be cleaned up after the duration of what is being complete. D. I. need to be maintained also. Discussed with RP over the issues. Will re-inspect on Friday. CAS #460
|
ESC07-01204
| Random Inspection | 5/5/2008 | 5/5/2008 | 5/5/2008 9:54:33 AM | A | PART |
|
|
Discussed with Super over clean-up of tracking and to minmumize it also. CAS #460
|