ESC08-00977
| Site Final | 5/5/2009 | 5/5/2009 | 5/7/2009 8:58:33 AM | P | CANC |
|
|
|
BLD08-02383
| BLD-Final | 5/4/2009 | 5/5/2009 | 5/7/2009 8:58:20 AM | P | NR |
|
|
herb Phone #: ###-####
|
BLD09-00357
| BLD-Footing | 5/4/2009 | 5/5/2009 | 5/5/2009 2:11:07 PM | P | PASS |
|
|
rick Phone #: ###-#### ft and wall ok mono placement.
|
ESC09-00132
| Random Inspection | 5/5/2009 | 5/5/2009 | 5/5/2009 2:10:30 PM | P | PART |
|
|
looks good
|
BLD08-01478
| BLD-Final | 5/4/2009 | 5/5/2009 | 5/5/2009 10:25:54 AM | A | FAIL |
|
|
alan Phone #: ###-#### need handrail to go to bottom of first run of stairs for temanation.
|
BLD09-00167
| BLD-Energy code compliance | 5/4/2009 | 5/5/2009 | 5/5/2009 9:53:26 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 5/4/2009 at 5:03:10 PM. Contact: ###-####. p/l eaves need gyp/ all other c/n idems ok. ok to rock.
|
ESC09-00050
| Random Inspection | 5/5/2009 | 5/5/2009 | 5/5/2009 9:51:58 AM | A | PART |
|
|
verbal sweep small area track out.
|