FIR04-00349
| INSP-Conference | 4/30/2009 | 4/30/2009 | | P | |
|
|
Jeff; Phone ###-####
|
FIR08-00855
| INSP-Sprinkler Rough-in/Hydro | 5/5/2009 | 5/5/2009 | 5/5/2009 3:54:05 PM | P | CANC |
|
|
Canceled due to time constraints.
|
FIR09-00090
| INSP-Final Inspection | 5/4/2009 | 5/5/2009 | 5/5/2009 3:52:20 PM | A | PASS |
|
|
permit finaled.
|
FIR09-00159
| INSP-Supply line flush | 5/4/2009 | 5/5/2009 | 5/5/2009 3:36:04 PM | A | PASS |
|
|
The underground flush passed.
|
FIR09-00088
| INSP-Final Inspection | 5/4/2009 | 5/5/2009 | 5/5/2009 3:35:35 PM | A | FAIL |
|
|
The wireless dialer needs to provide a separate signal to the off site monitoring for the supervisory signal.
|
FIR09-00085
| INSP-Final Inspection | 5/4/2009 | 5/5/2009 | 5/5/2009 3:33:20 PM | A | PASS |
|
|
permit finaled
|
FIR07-01032
| INSP-Sprinkler Rough-in | 5/4/2009 | 5/5/2009 | 5/5/2009 11:23:59 AM | A | FAIL |
|
|
No inspection was performed due to the city approved plans and as-builts not matching the installation. Provide city approved plans that match the installation.
|