Inspections for the day of: Tuesday, May 5, 2009.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00102 Tracking Control5/4/20095/5/20095/6/2009 12:55:09 PMAFAIL
Correction Notice: Verbal to RP
1. Clean up all tracking onto Baldcypress and all other paved areas.
3. Delineate areas for proper control access onto project, so not to have further violations.
Will re-inspect on 5/8/09PM
ESC06-01534 Aging Inspection5/5/20095/5/20095/5/2009 4:35:34 PM DONE
ESC06-01534 DOC - Permit Finaled5/5/20095/5/20095/5/2009 4:35:22 PMPPASS
ESC08-00706 General Inspection5/5/20095/5/20095/5/2009 2:29:05 PMPFAIL
Verbal to RP:
clean up all sediment out of the gutter pan at the area of project where final landscaping has been achieved. Will re-inspect on 5/7/09AM
ESC08-00952 Tracking Control5/5/20095/5/20095/5/2009 1:49:36 PMPFAIL
Tracking onto overland rd. Left a message with RP to have it cleaned up by 5/6/09 AM. Will re-inspect on 5/6/09 PM
ESC06-01521 Aging Inspection5/5/20095/5/20095/5/2009 12:53:23 PM DONE
ESC06-01521 DOC - Permit Finaled5/5/20095/5/20095/5/2009 12:53:12 PMPPASS
ESC09-00194 Site Preparation4/28/20095/5/20095/5/2009 10:21:32 AMAPASS
ESC06-01523 Aging Inspection5/5/20095/5/20095/5/2009 9:31:11 AM DONE
ESC06-01523 DOC - Permit Expired5/5/20095/5/20095/5/2009 9:30:59 AMPPASS
ESC08-00866 General Inspection5/5/20095/5/20095/5/2009 9:26:47 AMADONE
Went over the final stabilization process with the GC. Also made him aware that if you have not achieved final stabilization, that it will not hold up the C. of O.. Will re-inspect for a site final once contacted by the GC.
ESC08-01050 Tracking Control5/5/20095/5/20095/5/2009 9:13:14 AMAFAIL
Verbal to RP:
Clean up all tracking onto Warm Springs Rd. by the end of the day.
Then by 5/6/09 PM widen construction entrance to pervent further tracking. Will re-inspect on 5/7/09AM
ESC08-01008 General Inspection4/17/20095/5/20095/5/2009 8:49:34 AMAPASS
In the process of removing the stock pile at the west end of property.
ESC09-00214 Site Preparation5/5/20095/5/20095/5/2009 8:23:07 AM NR
ESC09-00215 Site Preparation5/5/20095/5/20095/5/2009 8:04:29 AM NR