BLD08-00264
| FIRE-Final Inspection | 4/28/2010 | 4/29/2010 | | A | |
|
|
Jim Phone #: ###-####
|
FIR09-00726
| INSP-Final Inspection | 5/5/2010 | 5/5/2010 | 5/10/2010 5:20:02 PM | P | PASS |
|
|
After hours fire alarm testing completed satisfactory, permit finaled.
|
BLD10-00763
| FIRE-Conference | 5/5/2010 | 5/5/2010 | 5/5/2010 5:34:08 PM | P | DONE |
|
|
On site visit to determine status of project related fire sprinkler work to be completed per scope of building permit. Discussion with contractor on site regarding construction underway, system impairment, code requirements, permit application and stop work order if conditions are not met.
|
FIR09-00612
| INSP-Final Inspection | 5/4/2010 | 5/5/2010 | 5/5/2010 5:04:23 PM | P | FAIL |
|
|
Two pendent heads at the first floor living room are blocked by surface mounted ceiling obstructions, missing escutcheon at one sw head basement level, master bedroom 2nd pc. canopies need adjustment, delay at flow switch <5 sec.
|
FIR09-00726
| INSP-Conference | 5/5/2010 | 5/5/2010 | 5/5/2010 4:50:23 PM | P | DONE |
|
|
Regarding project inspection schedule.
|
BLD09-00934
| FIRE-Final Inspection | 5/4/2010 | 5/5/2010 | 5/5/2010 4:49:16 PM | A | PASS |
|
|
Life safety passed, door without landing to have hardware removed as discussed prior to structural final.
|
BLD10-00827
| FIRE-Final Inspection | 5/4/2010 | 5/5/2010 | 5/5/2010 11:26:54 AM | A | PASS |
|
|
Items on correction list field verified for compliance, fire life safety finaled.
|