ESC10-00185
| Conference | 5/4/2010 | 5/5/2010 | 5/5/2010 3:05:07 PM | A | DONE |
|
|
10:00 on site: Met with contractor, RP, ACHD, Inspector 460 and 435. Reviewed de-watering procedures, including continuous dewatering. Ok to discharge into the storm drain drop inlet as long as the water is not turbid beyond standards. As well, reviewed trackout, debris, sign, etc. requirements. We will be following up.
|
ESC06-00473
| Aging Inspection | 5/5/2010 | 5/5/2010 | 5/5/2010 7:54:02 AM | | CANC |
|
|
Passed by inspector 450 on 4/3
|
ESC06-00465
| Aging Inspection | 5/5/2010 | 5/5/2010 | 5/5/2010 7:53:28 AM | | CANC |
|
|
Passed by inspector 450 on 3/4
|
ESC06-00466
| Aging Inspection | 5/5/2010 | 5/5/2010 | 5/5/2010 7:53:09 AM | | CANC |
|
|
Passed by inspector 450 on 3/4
|
ESC06-00467
| Aging Inspection | 5/5/2010 | 5/5/2010 | 5/5/2010 7:52:45 AM | | CANC |
|
|
Passed by inspector 450 on 3/4/10
|
ESC10-00297
| Site Preparation | 5/5/2010 | 5/5/2010 | 5/5/2010 7:52:00 AM | | CANC |
|
|
Passed by inspector 415 on 4/30/10
|