FIR10-00137
| INSP-Final Inspection | 5/2/2011 | 5/3/2011 | | A | |
|
|
EARL Phone #: ###-####
|
FIR10-00540
| INSP-Sprinkler Rough-in | 5/5/2011 | 5/5/2011 | 5/6/2011 5:26:38 PM | P | PART |
|
|
Preaction system piping at the second floor computer room approved for cover- see dated annotation on plans.
|
BLD09-01405
| FIRE-Conference | 5/5/2011 | 5/5/2011 | 5/5/2011 5:18:04 PM | P | DONE |
|
|
Conversation with tenant regarding spacing issues at fire sprinkler coverage.
|
BLD11-00362
| FIRE-Final Inspection | 5/5/2011 | 5/5/2011 | 5/5/2011 5:16:10 PM | A | PASS |
|
|
Fire life safety finaled.
|
FIR11-00053
| INSP-Final Inspection | 5/4/2011 | 5/5/2011 | 5/5/2011 5:14:41 PM | A | PASS |
|
|
Fire sprinkler permit work passed final inspection.
|
BLD11-00447
| FIRE-Final Inspection | 5/5/2011 | 5/5/2011 | 5/5/2011 5:13:28 PM | A | PART |
|
|
Need to post and provide current tags on fire extinguishers at the prep area and the bar, post max. occupant load sign.
|
BLD10-02926
| FIRE-Final Inspection | 5/5/2011 | 5/5/2011 | 5/5/2011 5:09:42 PM | P | PART |
|
|
Ref. activity notes for corrections.
|
BLD11-00221
| FIRE-Final Inspection | 5/5/2011 | 5/5/2011 | 5/5/2011 5:08:25 PM | A | PART |
|
|
Final pending noted correction items.
|