BLD14-01039
| BLD-Conference | 5/5/2014 | 5/5/2014 | 5/6/2014 4:41:26 PM | P | DEFR |
|
|
Phone #: ###-#### >> Inspection requested via web by Ira Rutledgeout of time
|
BLD14-00950
| BLD-Conference | 5/5/2014 | 5/5/2014 | 5/6/2014 4:39:20 PM | P | DEFR |
|
|
>> Inspection requested via web by Richard Murrayout of time
|
BLD14-01006
| BLD-Final | 5/2/2014 | 5/5/2014 | 5/6/2014 4:38:10 PM | A | DEFR |
|
|
Covertech Phone #: ###-####out of time
|
BLD14-00703
| BLD-Final | 5/2/2014 | 5/5/2014 | 5/6/2014 4:37:00 PM | A | DEFR |
|
|
kevin Phone #: ###-####out of time
|
BLD13-00192
| BLD-Framing/Rough-in | 5/2/2014 | 5/5/2014 | 5/5/2014 4:21:08 PM | A | PART |
|
|
JC Phone #: ###-#### resubmit for garage front. ok to cover roof and ext.
|
BLD14-00744
| BLD-Footing | 5/5/2014 | 5/5/2014 | 5/5/2014 4:19:49 PM | P | PASS |
|
|
Doug Phone #: ###-####
|
BLD14-00652
| BLD-Framing/Rough-in | 5/2/2014 | 5/5/2014 | 5/5/2014 1:39:34 PM | P | PART |
|
|
Adam Phone #: ###-#### need mech/ rebuild kitchen bearing wall/ truss bracing
|
BLD13-00182
| BLD-Other | 5/2/2014 | 5/5/2014 | 5/5/2014 10:27:58 AM | A | PASS |
|
|
j.c. - slab on deck Phone #: ###-#### beam rebar per design
|
BLD14-00644
| BLD-Final | 5/2/2014 | 5/5/2014 | 5/5/2014 10:11:17 AM | A | PASS |
|
|
call 30 min in advance // Perry Phone #: ###-####
|
BLD14-00644
| DOC - Permit Finaled | 5/5/2014 | 5/5/2014 | 5/5/2014 10:11:05 AM | P | PASS |
|
|
|
BLD14-00682
| BLD-Energy code compliance | 5/2/2014 | 5/5/2014 | 5/5/2014 9:58:56 AM | A | PASS |
|
|
brett Phone #: ###-####
|
BLD14-00682
| BLD-Framing/Rough-in | 5/5/2014 | 5/5/2014 | 5/5/2014 9:58:42 AM | A | PASS |
|
|
brett Phone #: ###-####
|
BLD13-02080
| BLD-Final | 5/2/2014 | 5/5/2014 | 5/5/2014 9:40:13 AM | A | FAIL |
|
|
Clint Phone #: ###-#### need public works/ 311.7.2 lights on stairs
|