ESC12-00364
| General Inspection | 5/5/2014 | 5/5/2014 | 5/5/2014 4:31:36 PM | | CANC |
|
|
Rescheduled for tomorrow AM.
|
ESC14-00342
| Site Preparation | 5/5/2014 | 5/5/2014 | 5/5/2014 4:12:48 PM | P | PASS |
|
|
John Phone #: ###-####
John Phone #: ###-####
Permit posted on house windown Contractor working on rear garage. No MS4 infrastructure in area. Approved for construction.
|
ESC14-00274
| Site Preparation | 5/5/2014 | 5/5/2014 | 5/5/2014 4:12:09 PM | P | PART |
|
|
Corrections issued to RP Bobby:
1. Clean up gutter in front of site. 2. Put some floor dry or other absorbent material on the oil/antifreeze spill on Woody Lane in front of house.
Corrections to be made today or by 9 AM tomorrow. Permit is posted, DI's protected and lined concrete washout is provided.
|
ESC13-00129
| Aging Inspection | 5/5/2014 | 5/5/2014 | 5/5/2014 3:32:29 PM | | PASS |
|
|
Finaled.
|
ESC13-00129
| DOC - Permit Finaled | 5/5/2014 | 5/5/2014 | 5/5/2014 3:32:14 PM | P | PASS |
|
|
No activity on BLD permit since June 2013. No construction acitivity of violations observed. ESC permit expired/conditions satisfied.
|
ESC13-00967
| Random Inspection | 5/5/2014 | 5/5/2014 | 5/5/2014 3:14:14 PM | P | PASS |
|
|
Grading and drainage is nearly complete and there is ongoing work inside the warehouse. See also ESC13-00840. No corrections at this time. No trackout. MS4 filter bags are in good condition.
|
ESC14-00165
| Site Preparation | 5/5/2014 | 5/5/2014 | 5/5/2014 3:03:35 PM | P | PASS |
|
|
3:00 PM appointment phone requested. JRW construction for new First Choice Collision Repair.
Tenant improvement to existing warehouse shell. One parking lot DI to protect, just need to be mindful of good placement for stockpiles. Main earth disturbing is for a new electrical/utility trench.
Approved.
|
ESC13-00349
| General Inspection | 5/5/2014 | 5/5/2014 | 5/5/2014 2:16:53 PM | | PASS |
|
|
Finalized.
|
ESC13-00349
| DOC - Permit Finaled | 5/5/2014 | 5/5/2014 | 5/5/2014 2:16:30 PM | P | PASS |
|
|
Tennis courts are complete. All construction materials removed from site and temporary BMPs. Disturbed grass area has reseeded and established. ESC permit conditions satisfied.
|
ESC12-00447
| Aging Inspection | 5/5/2014 | 5/5/2014 | 5/5/2014 2:02:16 PM | | PASS |
|
|
Abode Subdivision has several open lots remaining that have now vegetated. Utility trench in southwest corners is complete and filled in. DI bags have remaining filter capacity. No corrections at this time.
|
ESC14-00162
| Complaint Inspection | 5/5/2014 | 5/5/2014 | 5/5/2014 12:26:28 PM | P | FAIL |
|
|
Check for proper storage and daily housekeeping.
Sidewalk is dirty but no significant trackout to 20th Street or discharges/sediment runoff to the MS4 DI on Sherman. Stockpile from basement is placed too close to sidewalk so unstablized dirt is going onto side walk. Need to make the following corrections today; Written CN posted at site.
1. Sweep sidewalks at the end of each day
2. Clean any dirt/sediment tracked into the gutter at the end of each day.
3. Move stockpile or provide siltfence or wattle to prevent dirt from moving onto sidewalk.
RP has also been notified of corrections by telephone.
|
ESC13-00345
| General Inspection | 5/5/2014 | 5/5/2014 | 5/5/2014 11:22:40 AM | | PASS |
|
|
Vertical construction in progress on hangar. Multiple ESC permits at this site. See also ESC13-00892. No corrections required. No trackout to Aeronica. Permit posted in job trailer.
|
ESC12-00906
| Aging Inspection | 5/5/2014 | 5/5/2014 | 5/5/2014 11:04:04 AM | | PASS |
|
|
No ESC violations or construction observed. Project activity has recently resumed in April.
|
ESC14-00019
| Complaint Inspection | 5/5/2014 | 5/5/2014 | 5/5/2014 10:47:18 AM | P | PART |
|
|
HC Company on site working. No significant trackout at time of inspection. There is a strip of dirt in parking lot that is the source of some trackout that was reported previously.
Sweeping should be daily until the strip is paved.
|
ESC13-01231
| Random Inspection | 5/5/2014 | 5/5/2014 | 5/5/2014 10:44:08 AM | P | PASS |
|
|
See ESC13-01266 for inspection notes. No corrections required at Boise Heights.
|
ESC13-01226
| Random Inspection | 5/5/2014 | 5/5/2014 | 5/5/2014 10:42:28 AM | P | PASS |
|
|
Perimeter BMPs and DI protection is good. No signifcant trackout on surrounding streets. No corrections at this time.
|
ESC11-00192
| General Inspection | 5/5/2014 | 5/5/2014 | 5/5/2014 10:08:23 AM | | PASS |
|
|
BMPs in good condition. The mulching/hydoseed applications have stabilized dirt with tacifier, but not yet fully vegetated.
No trackout or hillside erosion observed. 2 houses in progress also no violations observed.
|
ESC13-00193
| General Inspection | 5/5/2014 | 5/5/2014 | 5/5/2014 10:01:17 AM | | PASS |
|
|
Culdesac is paved with most sidewalks installed. Perimter silt fences in good condition. New storm drains have inlet protection No trackout to Crestline or discharges to stormwater pond observed. Note: New sand and grease interceptor installed for treatment of water before entering the pond. Should install rocks (rip rap) at the spout to prevent gullying in large storm events.
|
ESC13-00902
| Site Preparation | 5/2/2014 | 5/5/2014 | 5/5/2014 9:23:49 AM | A | PASS |
|
|
Mikeal Phone #: ###-####
Two infill lots in West End. Permit posted on north fence. Flat. No MS4 drop inlets in vicinity. Access will be through alley. Will use leak proof containers for liquid waste & washout.
|
ESC13-00903
| Site Preparation | 5/2/2014 | 5/5/2014 | 5/5/2014 8:54:07 AM | A | PASS |
|
|
Mikeal Phone #: ###-####
Met RP onsite to discuss ESC permit conditions. Ready for construction.
|