BLD15-01028
| FIRE-Alarm Testing | 5/5/2015 | 5/5/2015 | 5/5/2015 3:28:29 PM | P | CANC |
|
|
Wrong inspection type scheduled
|
BLD15-01028
| FIRE-Final Inspection | 5/5/2015 | 5/5/2015 | 5/5/2015 3:20:07 PM | P | FAIL |
|
|
Install single action hardware on doors as discussed, mount fire extinguishers, remove the two exit signs leading people to the dock, remove plastic wall obstruction in the basement, provide sticker at the main exit.
|
FIR15-00232
| INSP-Final Inspection | 5/4/2015 | 5/5/2015 | 5/5/2015 1:58:56 PM | P | PASS |
|
|
Permit finaled
|
FIR15-00082
| INSP-Sprinkler Rough-in/Hydro | 5/4/2015 | 5/5/2015 | 5/5/2015 1:56:01 PM | A | PART |
|
|
First floor hydro test failed. Rough-in passed. Contractor to provide sheet rock on exposed wood at accordian door. And per contractor there will be no storage of paper in the Copy Center there fore light hazard spacing is ok.
|
NAF15-00006
| INSP-Sprinkler Rough-in/Hydro | 5/5/2015 | 5/5/2015 | 5/5/2015 10:52:15 AM | P | PART |
|
|
First floor overhead hydro test failed. First floor rough-in passed for the most part. See the city approved plans for locations where piping is ok to cover as marked in red. Plan modifications are required due to pipe routing changes due to steel beams. The area where these changes are located can not be covered until the plan modifications have been approved.
|
FIR15-00257
| INSP-Sprinkler Rough-in | 5/4/2015 | 5/5/2015 | 5/5/2015 10:15:38 AM | A | CANC |
|
|
Wrong address called in for inspection
|
FIR15-00256
| INSP-Sprinkler Rough-in | 5/4/2015 | 5/5/2015 | 5/5/2015 10:14:59 AM | A | CANC |
|
|
Wrong address called in for inspection
|
NAF14-00028
| INSP-Sprinkler Rough-in/Hydro | 5/4/2015 | 5/5/2015 | 5/5/2015 10:06:42 AM | A | CANC |
|
|
Wrong permit number called in.
|
BLD15-00408
| FIRE-Final Inspection | 5/4/2015 | 5/5/2015 | 5/5/2015 9:06:23 AM | A | PASS |
|
|
Life safety passed
|
BLD15-01361
| FIRE-Final Inspection | 5/4/2015 | 5/5/2015 | 5/4/2015 2:13:58 PM | A | PASS |
|
|
life safety passed
|