BLD15-00788
| BLD-Framing/Rough-in | 5/4/2015 | 5/5/2015 | 5/5/2015 3:56:22 PM | A | PART |
|
|
This project is in phases. This would be for small office/ break room for phase 1. Darius Saxton Phone #: ###-#### Inspection requested via web by Brad Turk. Interior steel stud framed walls for phase 1 work. Noted that an interior 5" x 5" tube steel coulmn has been found that was not noted on plans, architect to provide a listed assembly for colomn. Aslo noted at radiology room remodel that interior portion of existing corridor is not maintained. Addtional 5/8" type rock will need o be installed.
|
BLD14-02632
| BLD-Foundation | 5/5/2015 | 5/5/2015 | 5/5/2015 3:49:02 PM | P | PASS |
|
|
Tom-rebar Phone #: ###-####. Column footings for new signs westside of building C.
|
BLD14-02632
| BLD-Footing | 5/5/2015 | 5/5/2015 | 5/5/2015 3:39:57 PM | P | CANC |
|
|
rebar Phone #: ###-####
|
BLD13-03600
| BLD-Wall Bracing | 5/5/2015 | 5/5/2015 | 5/5/2015 3:38:55 PM | P | PASS |
|
|
exterior shear Phone #: ###-#### Inspection requested via web by Mel Rawlinson
|
BLD13-03582
| BLD-Wall Bracing | 5/5/2015 | 5/5/2015 | 5/5/2015 3:25:03 PM | P | PASS |
|
|
exterior shear Phone #: ###-#### Inspection requested via web by Mel Rawlinson
|
BLD13-03583
| BLD-Wall Bracing | 5/5/2015 | 5/5/2015 | 5/5/2015 2:51:58 PM | P | PASS |
|
|
exterior shear Phone #: ###-#### Inspection requested via web by Mel Rawlinson
|
BLD13-03590
| BLD-Framing/Rough-in | 5/5/2015 | 5/5/2015 | 5/5/2015 2:49:04 PM | P | NR |
|
|
rough frame inspection Phone #: ###-#### Inspection requested via web by Mel Rawlinson. Needs fire sprinkler rough in inspection.
|
BLD13-03579
| BLD-Wall Bracing | 5/5/2015 | 5/5/2015 | 5/5/2015 1:55:38 PM | P | PASS |
|
|
2nd floor intershear Phone #: ###-#### Inspection requested via web by Mel Rawlinson
|
BLD14-03466
| BLD-Final | 5/4/2015 | 5/5/2015 | 5/5/2015 1:33:09 PM | P | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Laurie Hoelscher
|
BLD14-03466
| DOC - Permit Finaled | 5/5/2015 | 5/5/2015 | 5/5/2015 1:32:47 PM | P | PASS |
|
|
|
BLD15-00897
| BLD-Wall Bracing | 5/4/2015 | 5/5/2015 | 5/5/2015 1:31:38 PM | P | PASS |
|
|
Shear // Brett Phone #: ###-####
|
BLD15-00172
| BLD-Final | 5/4/2015 | 5/5/2015 | 5/5/2015 1:31:01 PM | A | PASS |
|
|
Brett Phone #: ###-####
|
BLD15-00172
| DOC - Permit Finaled | 5/5/2015 | 5/5/2015 | 5/5/2015 1:30:37 PM | P | PASS |
|
|
|
BLD15-01104
| BLD-Foundation | 5/5/2015 | 5/5/2015 | 5/5/2015 12:45:20 PM | A | NR |
|
|
Mark - ###-####-foundation rebar. Needs elec. rough in.
|
GCB15-00004
| GCB-Final | 5/4/2015 | 5/5/2015 | 5/5/2015 11:39:32 AM | A | PASS |
|
|
Brandon ###-####. All issues resolved.
|
BLD14-03466
| BLD-Conference | 5/4/2015 | 5/5/2015 | 5/4/2015 3:43:05 PM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Laurie Hoelscher Inspection cancelled from web by: Laurie Hoelscher
|