Inspections for the day of: Tuesday, May 5, 2015.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00588 Conference5/5/20155/5/20155/5/2015 4:35:07 PMPDONE
ESI foreman Kevin Honeycutt called to notify me that he can be contacted for ESC corrections and issues at District site. # ###-####
ESC14-00515 Site Final5/5/20155/5/20155/5/2015 4:31:39 PMPPASS
Bank next to driveway has been stabilized with sod and mulch. A small check dam has been built to capture sediment running towards Greenbelt. No further requests. ESC permit conditions satisfied.
ESC14-00515 DOC - Permit Finaled5/5/20155/5/20155/5/2015 4:30:04 PMPPASS
ESC14-00572 General Inspection5/5/20155/5/20155/5/2015 3:50:42 PM PASS
Disturbed hillside revegetation is in progress. The yard surrounding home is landscaped and the perimeter hillsides have been hydroseeded. Wattles have been installed at intervals.

Will continue to monitor to see if grass establishes.
ESC14-00888 General Inspection5/5/20155/5/20155/5/2015 2:51:23 PM PASS
Vegetative perimeter from previous landscaping has been preserved on east side of project. Inlets around site have protection, construction entrance is installed, and permit posted.

No fugitive dust, discharges, or other issues observed. No corrections needed. WIP
ESC14-00583 Aging Inspection5/5/20155/5/20155/5/2015 1:34:53 PM PASS
Home complete, landscaped and occupied. Ongoing projects in Tianna Park are clean with no uncontained trash, trackout, or discharges.
ESC14-00583 DOC - Permit Finaled5/5/20155/5/20155/5/2015 1:33:55 PMPPASS
ESC14-01200 Random Inspection5/5/20155/5/20155/5/2015 12:41:56 PMPPASS
WIP on Norco warehouse demo & expansion. No trackout from site, eco-pan cement washout on site. Sediment and materials well contained within in Norco compound. Parking lot DIs have sediment protection. No corrections needed.
ESC14-00941 General Inspection5/5/20155/5/20155/5/2015 12:38:08 PM PASS
Skywest Hangar construction continues. Interior work and site development and preparation of taxi runway has started staging. No trackout from site, no fugitive dust observed from active stockpiles. Approved.

See also ESC14-01128
ESC14-01047 DOC - Permit Finaled5/5/20155/5/20155/5/2015 12:17:11 PMPPASS
Work complete. Fence installed. Vegetation below wall is well established. BLD permit subgrade approved.
ESC14-01041 DOC - Permit Finaled5/5/20155/5/20155/5/2015 12:16:59 PMPPASS
Work complete. Fence installed. Vegetation below wall is well established. BLD permit subgrade approved.
ESC15-00347 Site Preparation5/5/20155/5/20155/5/2015 10:51:36 AMAPASS
Demolition of old church sanctuary to make more space on grounds. IDS onsite with water truck for dust and dump truck to haul away materials.

No discharges from site, no dust plumes. Security fence installed around site. Church members watching the work/supervising.
Approved. Will check back for site cleanup.
ESC14-01041 General Inspection5/5/20155/5/20155/5/2015 10:18:04 AM PASS
ESC14-00649 Aging Inspection5/5/20155/5/20155/5/2015 10:10:53 AM PASS
WIP. No sediment leaving site. Work almost complete, no further earthwork but some of the front yard area needs stabilization or landscaping.
ESC14-00514 General Inspection5/5/20155/5/20155/5/2015 9:26:32 AM PASS
Drop inlet bag on MS4 on McGregor to the east of Campbell Co. has been removed as requested.

Bag to the west on McGregor will be removed when the adjacent project (ESC14-01030) is complete.

ESC permit conditions satisfied; permit finaled.
ESC14-00514 DOC - Permit Finaled5/5/20155/5/20155/5/2015 9:24:31 AMPPASS
ESC14-00647 Aging Inspection5/5/20155/5/20155/5/2015 8:43:24 AM PASS
ESC14-01047 General Inspection5/5/20155/5/20155/5/2015 8:39:30 AM PASS