FIR16-00785
| INSP-Sprinkler Rough-in/Hydro | 5/5/2017 | 5/5/2017 | 5/5/2017 1:42:06 PM | P | PASS |
|
|
Thrust Block inspection passed.
|
NAF16-00010
| INSP-Sprinkler Rough-in/Hydro | 5/4/2017 | 5/5/2017 | 5/5/2017 1:24:42 PM | P | PASS |
|
|
Hydro test for systems 1, 2, & 3 building "D" Pass
|