BLD19-04600 BLD-Framing/Rough-in5/5/20205/5/20205/6/2020 8:57:07 AMPPART
framing corrections ok, need fire sprinkler approval prior to cover, ok to insulate WALLS only//
BLD19-00536 BLD-Framing/Rough-in5/4/20205/5/20205/6/2020 8:56:23 AMPPART
Inspection to allow insulation install. Phone #: ###-#### Inspection requested via web by Travis Blackburn//add bolts as discussed, fix holddowns, 1/2 trusses were looked at, some corrections required, will check at next inspection//
BLD19-00536 BLD-Wall Bracing5/5/20205/5/20205/6/2020 8:55:21 AMPPASS
most shear corrections made, some hardware will be addressed during framing inspeciton//
BLD20-00518 BLD-Framing/Rough-in5/5/20205/5/20205/6/2020 8:54:34 AMPCANC
screened // Zach Phone #: ###-####//spoke with Zach, this permit is for demo only, the BLD for construction is still under review, he will call in inspection once review is complete//
BLD20-00061 BLD-Footing5/5/20205/5/20205/5/2020 1:14:50 PMPPART
screened - addition // Troy Phone #: ###-####//WIP//still digging footings//will take photos of pour to show at wall inspection or other footing inspection//footing under house//
BLD20-00397 BLD-Footing5/5/20205/5/20205/5/2020 12:40:28 PMPCANC
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD19-03180 BLD-Energy code compliance5/5/20205/5/20205/5/2020 11:18:58 AMANR
Firewall insulation Phone #: ###-#### Inspection requested via web by Carl Funk/needs framing inspeciton completed on separation walls prior to insulation//will reschedule when insulation is removed//
BLD19-03181 BLD-Energy code compliance5/5/20205/5/20205/5/2020 11:18:45 AMANR
Firewall insulation Phone #: ###-#### Inspection requested via web by Carl Funk/needs framing inspeciton completed on separation walls prior to insulation//will reschedule when insulation is removed//
BLD19-03187 BLD-Energy code compliance5/5/20205/5/20205/5/2020 11:18:31 AMANR
Phone #: ###-#### Inspection requested via web by Carl Funk/needs framing inspeciton completed on separation walls prior to insulation//will reschedule when insulation is removed//
BLD19-03188 BLD-Energy code compliance5/5/20205/5/20205/5/2020 11:18:16 AMANR
Phone #: ###-#### Inspection requested via web by Carl Funk//needs framing inspeciton completed on separation walls prior to insulation//will reschedule when insulation is removed//
BLD19-00534 BLD-Framing/Rough-in5/4/20205/5/20205/5/2020 11:16:56 AMAPART
Inspection to insulate 1st floor Phone #: ###-#### Inspection requested via web by Travis Blackburn//add bolts as noted on floor//fix holddown that is not installed//fire caulk areas noted//photos of repairs will be sent//
MIS20-00142 BLD-Conference5/4/20205/5/20205/5/2020 9:18:46 AMADONE
Per Brian Mechanical Inspector - roof shingles torn off, and structure being built in the back yard without permits. Phone #: ###-####//CN issued to obtain permits//owner was onsite, discussed need for permits, advised them to stop work, so inspection could take place after permit is issued//will be back in two days//
BLD19-04600 BLD-Framing/Rough-in5/4/20205/5/20205/5/2020 8:43:25 AMANH
Alex Phone #: ###-####//no one onite doors locked, knocked on front door no one answered//sprinkler permit has not had a rough in inspection//
BLD19-01124 BLD-Aging Inspection5/5/20205/5/20205/5/2020 8:25:04 AM FAIL
no inspections requested//
MIS20-00134 BLD-Conference4/28/20205/5/20205/5/2020 8:23:49 AMADONE
follow up on occupancy permit//still no permit issued for occupancy, this is a 5 day followup, will check back end of week, and issue 2nd correction if no permit has been issued//