ELE02-01039
| Final | 5/3/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/03/2002 at 08:42:03. Contact: ###-####.
300.11 5/6/2002 11:11:50 AM
|
ELE02-00771
| Final | 5/3/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | A | PASS |
|
|
FN ###-####- bonding to hot water undersized 5/6/2002 11:38:33 AM
|
ELE01-03949
| Electrical Rough-In | 5/6/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 05/06/2002 at 07:43:35. Contact: ###-####. COW most everything you can think of was wrong Jim will have another conf. 5/6/2002 3:45:12 PM
|
ELE02-01234
| Electrical Rough-In | 5/6/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | P | PASS |
|
|
ERIC ###-####
Has Power already 5/6/2002 4:45:24 PM
|
ELE02-01039
| Final | 5/6/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
ELE02-01237
| Electrical Rough-In | 5/6/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | P | PASS |
|
|
ERIC ###-####
P/S U/G N Ok 5/6/2002 4:44:10 PM
|
ELE02-01248
| Electrical Rough-In | 5/6/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | P | PASS |
|
|
ERIC ###-####
P/S U/G N Ok 5/6/2002 4:44:36 PM
|