Inspections for the day of: Monday, May 6, 2002.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02888 BLD-Foundation5/3/20025/6/20025/6/2002 12:00:00 AMACANC
Scheduled by Inspector: 407 On 5/3/2002 6:54:15 PM entered in twice. 5/6/2002 7:55:36 AM
BLD02-01001 BLD-Framing/Rough-in5/6/20025/6/20025/6/2002 12:00:00 AMAPASS
Scheduled by Inspector: 407 On 5/6/2002 7:54:21 AM Ok to cover wall to roof deck/joist straps. Called Brian ###-#### and informed ok.5/6/2002 12:07:54 PM 5/6/2002 12:10:40 PM
BLD99-00444 BLD-Conference5/3/20025/6/20025/6/2002 12:00:00 AMAPART
PAT ###-#### OR ###-#### FOR CONF . new details for glass railings from engineer ok. 5/6/2002 12:07:13 PM
BLD02-01035 BLD-Foundation5/3/20025/6/20025/6/2002 12:00:00 AMPFAIL
PLANS ON CLIPBOARD ON THE FORMS-GEORGE- ###-#### . Needs a continous footing as shown on attached BC green res garage book as on plans . Called number shown and informed. 5/6/2002 6:35:59 PM
BLD01-02802 BLD-Framing/Rough-in5/6/20025/6/20025/6/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 05/06/2002 at 07:38:19. Contact: ###-####.. need addnl bolts in z bar. also engineering stamped. 5/6/2002 7:01:52 PM
BLD01-01778 BLD-Foundation5/6/20025/6/20025/6/2002 12:00:00 AMPPART
###-#### JED . poured appears ok, 5:40 pm , had meeting this day unable to make before 5:00. 5/6/2002 6:42:17 PM
BLD02-00362 BLD-Framing/Rough-in5/6/20025/6/20025/6/2002 12:00:00 AMPFAIL
SHEER WALL PLANS ARE NOW ON SITE(ANGIE ###-####)c/n posted. 5/6/2002 6:43:13 PM