BLD02-00844
| BLD-Footing | 5/3/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/03/2002 at 12:30:08. Contact: ###-####. wip rebar on truck 5/6/2002 11:08:55 AM
|
MEC02-01232
| Final | 5/3/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | A | PASS |
|
|
###-#### LELA
|
BLD02-00564
| BLD-Framing/Rough-in | 5/3/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | A | NR |
|
|
###-#### needs 2 full lenth studs on outside straps on 1st floor per eng 5/6/2002 10:40:34 AM
|
BLD02-00563
| BLD-Framing/Rough-in | 5/3/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | A | NR |
|
|
###-####
|
BLD02-00530
| BLD-Framing/Rough-in | 5/3/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | A | NR |
|
|
###-####
|
BLD02-00408
| BLD-Framing/Rough-in | 5/6/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | P | PASS |
|
|
fr pete ###-#### for borah-portable class room next to green house -plans above med cabinet
|
BLD02-00564
| BLD-Framing/Rough-in | 5/6/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | P | PASS |
|
|
TRAVIS ###-####
|
BLD02-00563
| BLD-Framing/Rough-in | 5/6/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | P | PASS |
|
|
TRAVIS ###-####
|
BLD02-00530
| BLD-Framing/Rough-in | 5/6/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | P | PASS |
|
|
TRAVIS ###-####
|
BLD02-00306
| BLD-Framing/Rough-in | 5/6/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | P | PASS |
|
|
TRAVIS ###-####
|
BLD02-00562
| BLD-Framing/Rough-in | 5/6/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | P | PASS |
|
|
TRAVIS ###-####
|
BLD02-00561
| BLD-Framing/Rough-in | 5/6/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | P | PASS |
|
|
TRAVIS ###-####
|
BLD02-01040
| BLD-Footing | 5/6/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | P | PART |
|
|
###-#### RANDY wip 5/6/2002 1:10:05 PM
|