BLD01-02888
| BLD-Concrete | 5/3/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 407 On 5/3/2002 4:22:03 PM masonary retaining wall 5/6/2002 10:29:41 AM
|
BLD02-00218
| BLD-Framing/Rough-in | 5/3/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | A | PART |
|
|
###-####
hds ok to cover,, need trades b-4 the rest of framing can be done 5/6/2002 11:18:06 AM
|
BLD02-00218
| BLD-Energy code compliance | 5/3/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | A | PART |
|
|
###-####
seal ok 5/6/2002 11:17:10 AM
|
BLD02-00362
| BLD-Framing/Rough-in | 5/3/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | A | NR |
|
|
SHEER WALL ###-#### STEVE
|
BLD02-00591
| BLD-Framing/Rough-in | 5/3/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | A | PASS |
|
|
###-#### JEFF
|
BLD02-00231
| BLD-Framing/Rough-in | 5/3/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | P | NR |
|
|
###-#### justin
|
BLD01-02888
| BLD-Framing/Rough-in | 5/6/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | P | NR |
|
|
fr justin ###-####
|
BLD01-03008
| BLD-Framing/Rough-in | 5/6/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | P | PART |
|
|
###-#### DARRELL SHEER INSPECT
ext shear ok, verify completion of hds at frame, nailing ok on exterior 5/6/2002 3:06:19 PM
|
BLD02-00846
| BLD-Footing | 5/6/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | P | PART |
|
|
###-#### JIM
|
BLD02-00233
| BLD-Framing/Rough-in | 5/6/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | P | PART |
|
|
mike- ###-#### fr
c/n posted on insulation tag 5/6/2002 4:17:08 PM
|
BLD02-01027
| BLD-Footing | 5/6/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | P | PART |
|
|
###-#### JEFF
|
BLD00-03133
| BLD-Final | 5/6/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | P | FAIL |
|
|
###-#### JIM CALL FOR ACCESS
need trades sign off, handrail 5/6/2002 1:18:45 PM
|
MEC02-01220
| Pressure Test | 5/6/2002 | 5/6/2002 | 5/6/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 415 On 5/6/2002 3:56:09 PM
|