Inspections for the day of: Tuesday, May 6, 2003.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02557 FIRE-Final Inspection5/5/20035/6/20035/6/2003 12:00:00 AMAPASS
Fire life safety finaled 5/6/2003 11:19:38 AM
FIR03-00128 INSP-Sprinkler Rough-in5/6/20035/6/20035/6/2003 12:00:00 AMPFAIL
The sprinkler piping and risers as installed do not match the approved plans. Resubmit plans that show as-built information. Do not cover pipe until plans have been approved and reinspected. A do not cover sticker was left at project. The east side second floor apartment plan shows 1 1/2 pipe to be installed. 1" is installed. Could not verify piping per notes #5, #6 and #7. Per review note #8 1 1/2 pipe is to be installed but 1 1/4 is installed. Resubmitt calculations. No other items inspected 5/6/2003 2:59:50 PM
FIR03-00185 INSP-Sprinkler Rough-in5/6/20035/6/20035/6/2003 12:00:00 AMPPASS
RICK; Phone #: ###-#### Fire sprinkler roughin ok. Sprinklers are ok to cover. Hole in wall needs patched 5/6/2003 11:44:27 AM
FIR03-00055 INSP-Alarm Testing5/2/20035/6/20035/6/2003 12:00:00 AMPNR
Troy Peterson, the technitician for AEI wanted to test all devices before my inspection. It wasn't done prior. I agreed. 5/6/2003 2:44:39 PM
FIR03-00127 INSP-Alarm Testing5/2/20035/6/20035/6/2003 12:00:00 AMPFAIL
Smoke detector is not compatible with the fire alarm panel. No inspection done 5/6/2003 2:48:59 PM
FIR03-00030 INSP-Final Inspection5/5/20035/6/20035/6/2003 12:00:00 AMPFAIL
No approved plans on site. To be rescheduled for tomorrow 5/6/2003 1:38:05 PM
FIR03-00078 INSP-Sprinkler Rough-in/Hydro5/5/20035/6/20035/6/2003 12:00:00 AMPPASS
Jonathon is Foreman on site. Later afternoon inspection around 3:00 if possible.; Phone #: ###-#### Internet Inspection Request from: Trent Bice