Inspections for the day of: Thursday, May 6, 2004.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00042 FIR-Aging Inspection5/6/20045/6/20045/6/2004 12:00:00 AM PART
Talked to george and Ron and they will check the status and will schedule for inspection 5/6/2004 8:55:58 AM
BLD02-02815 FIRE-Final Inspection5/6/20045/6/20045/6/2004 12:00:00 AMANR
Scheduled by a contractor via Hello! on 5/6/2004 at 7:06:34 AM. Contact: ###-####. Received call from Mike and he said the sprinkler plans are being resubmitted due to changes 5/6/2004 11:25:34 AM
FIR03-00646 INSP-Alarm Testing5/5/20045/6/20045/6/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 5/5/2004 at 1:08:14 PM. Contact: ###-####. Satchel's hood system connected to zone 5 as shown on plans; awaiting upgrade agreement for the exsisting building alarm system 5/6/2004 11:01:42 AM
MIS04-00127 FIR-Final5/5/20045/6/20045/6/2004 12:00:00 AMAFAIL
Hal -- he is having his BLD final this morning as well. thanks.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Fire extinguisher at counter requires annual certification 5/6/2004 9:31:02 AM
FIR04-00118 INSP-Final Inspection5/6/20045/6/20045/6/2004 12:00:00 AMANR
Scheduled by a contractor via Hello! on 5/6/2004 at 6:50:16 AM. Contact: ###-####. Alarms not ready so this will be inspected with the alarm final 5/6/2004 8:48:11 AM
BLD03-02947 FIRE-Final Inspection5/6/20045/6/20045/6/2004 12:00:00 AMANR
Scheduled by a contractor via Hello! on 5/6/2004 at 6:52:31 AM. Contact: ###-####. Alarms not ready so this will be inspected at alarm final 5/6/2004 8:48:34 AM
BLD01-02245 BLD-Conference5/6/20045/6/20045/6/2004 12:00:00 AMAPART
The fire sprinkler permit has not been finaled so Debest was notified about the open permit and they will schedule a final inspection 5/6/2004 4:10:10 PM
BLD03-00430 FIRE-Final Inspection5/6/20045/6/20045/6/2004 12:00:00 AMAPART
Completed the fire alarm connection from Satchel's hood extinguishing system to building alarm system per plans; awaiting upgrade agreement of the exsisting alarm system 5/6/2004 11:03:34 AM
FIR03-00693 INSP-Conference5/6/20045/6/20045/6/2004 12:00:00 AMPPART
Ron; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Met with Dan and reviewed plans; the exsisting horn/strobes in computer room aren't shown on any NAC panel. He will talk to Simplex about it. 5/6/2004 4:06:34 PM
FIR04-00064 INSP-Conference5/6/20045/6/20045/6/2004 12:00:00 AMPPART
Met with Dan and this will be tested on 5/10 at 7 pm. FIR03-00693 is almost complete so this permit can be tested as separate permit; All of the new NAC panels are installed and allof the new notification appliances witht the exception of the computer room which has exsisting notification 5/6/2004 4:09:02 PM
FIR04-00111 INSP-Final Inspection5/6/20045/6/20045/6/2004 12:00:00 AMPPASS
FIR04-00262 INSP-Final Inspection5/6/20045/6/20045/6/2004 12:00:00 AMPPASS
treasure valley; Phone #: ###-#### Internet Inspection Request from: Barbara Moore open office area drops were not to plans as the drops were from different 1.5 inch lines; spacing okay 5/6/2004 2:45:05 PM
FIR04-00234 INSP-Sprinkler Rough-in/Hydro5/6/20045/6/20045/6/2004 12:00:00 AMPPASS
Erinie; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Minor changes were made due to wall changes - spacing maintained 5/6/2004 2:08:55 PM