ESC04-00011
| Site Preparation | 5/6/2005 | 5/6/2005 | 5/9/2005 2:05:39 PM | P | PART |
|
|
Failure at job site due to high rain event the night before. Took actions with owners rep and contractors. No release of sediment has been done through pond systems. Maybe minor trackout but, sweeping has been done. Some structual bmp's are needed unti
|
ESC04-00011
| Conference | 5/6/2005 | 5/6/2005 | 5/6/2005 10:11:34 AM | A | DONE |
|
|
Jeff--###-####: Received call at 7:15 a.m. Due to large rain event the night before, problems had occurred. RP requested that I assist in addressing the problem. Contractors, myself and owners rep developed a game plan to stablize slopes, slow runoff,
|