ELE08-01119
| Final | 5/6/2008 | 5/6/2008 | 5/6/2008 4:21:37 PM | P | PASS |
|
|
JAY Phone #: ###-#### ok to final
|
ELE08-00768
| Electrical Rough-In | 5/5/2008 | 5/6/2008 | 5/6/2008 3:36:18 PM | P | PASS |
|
|
ug conduit Phone #: ###-#### Internet Inspection Request from: Lee VanSchoiack ok to cover u/g next part from west to east stake
|
ELE08-00990
| Conference | 5/6/2008 | 5/6/2008 | 5/6/2008 3:06:49 PM | P | DONE |
|
|
We have made some changes. The riser will only be 9 inches above the tank so we changed out the pvc to ridgid and wraped it with corrision tape they would like to back fill tommorow thanks Scott Phone #: ###-#### Internet Inspection Request from: Scott Abbott talked to contractor, see ri
|
ELE08-00990
| Electrical Rough-In | 5/6/2008 | 5/6/2008 | 5/6/2008 1:59:02 PM | P | PASS |
|
|
We have made some changes. The riser will only be 9 inches above the tank so we changed out the pvc to ridgid and wraped it with corrision tape they would like to back fill tommorow thanks Scott Phone #: ###-#### Internet Inspection Request from: Scott Abbott ok to cover raceway at east end
|
ELE08-01133
| Electrical Rough-In | 5/6/2008 | 5/6/2008 | 5/6/2008 1:39:39 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: David Nelson called contractor, ric ok
|
ELE08-00342
| Rough-In Permanent Service | 5/6/2008 | 5/6/2008 | 5/6/2008 12:50:05 PM | P | PASS |
|
|
taggart Phone #: ###-#### looked at new elect building, ric ok p/s u/g n ok, looked at new service on north, p/s u/g rec ok
|
ELE08-00770
| Final | 5/5/2008 | 5/6/2008 | 5/6/2008 11:37:20 AM | A | PASS |
|
|
Please call Matt with any questions. Thank you. Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa met contractor, ok to final
|
ELE08-01016
| Rough-In Permanent Service | 5/5/2008 | 5/6/2008 | 5/6/2008 10:09:44 AM | A | PASS |
|
|
Electrician on site - Gene ###-####. Thank you!! Phone #: ###-#### Internet Inspection Request from: Tracy Robertson ric ok, p/s u/g n ok, 5 meters required
|
ELE08-00705
| Electrical Rough-In | 5/5/2008 | 5/6/2008 | 5/6/2008 9:04:24 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 5/5/2008 at 10:32:47 AM. Contact: ###-####. u/g ok to cover north of west building and about 20' at east of parking lot for access building area.
|
ELE08-01063
| Final | 5/5/2008 | 5/6/2008 | 5/6/2008 8:24:06 AM | A | CANC |
|
|
cover inspection Phone #: ###-#### Internet Inspection Request from: Jari Rivers see ri
|
ELE08-01063
| Electrical Rough-In | 5/5/2008 | 5/6/2008 | 5/6/2008 8:23:15 AM | A | FAIL |
|
|
cover inspection Phone #: ###-#### Internet Inspection Request from: Jari Rivers called, left correction notice,NEC 680.10 PVC shall be minimum 18" deep. U/G wiring shall not be within 5' of inside wall of pool wall, 352.26 there shall not be over 4 quarter bends in raceway, 110.26(A)(3) work space shall be clear from grade, 300.5D)(4) raceway subject to damage shall be schedule 80
|