Inspections for the day of: Tuesday, May 6, 2008.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00093 FIR-Aging Inspection5/6/20085/6/20085/8/2008 3:48:12 PM NR
work is in progress
FIR07-00863 INSP-Sprinkler Rough-in/Hydro5/5/20085/6/20085/6/2008 4:02:02 PMAPART
First floor wet system and second floor anti-freeze system hydro tests passed. First floor sprinkler piping rough-in is passed and the piping can be covered. See the city approved plans for the location of one pendant that needs relocated and one pendant that needs to be added on the first floor. The second floor anti-freeze piping does not quite match the plans. Mike is going to have a set of as-builts made with modified hydraulic calculations for the next inspection.
FIR08-00212 INSP-Sprinkler Rough-in/Hydro5/5/20085/6/20085/6/2008 3:27:02 PMAPART
See the city approved plans for rooms marked in red with "OK" that can have the piping covered. The rooms with out the "OK" either had defieciencies or did not have completed work and can not be covered. No sprinkler contractor was on site.
FIR08-00036 INSP-Sprinkler Rough-in/Hydro5/2/20085/6/20085/6/2008 3:25:13 PMAPASS
Above ground hydro test passed.
FIR05-00863 INSP-Final Inspection5/5/20085/6/20085/6/2008 2:31:16 PMAPASS
Permit finaled