Inspections for the day of: Tuesday, May 6, 2008.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-03226 BLD-Conference5/6/20085/6/20085/6/2008 5:38:49 PMPCANC
BLD06-03226 DOC - Permit Expired5/6/20085/6/20085/6/2008 5:38:45 PMPPASS
BLD06-03283 BLD-Conference5/6/20085/6/20085/6/2008 5:38:30 PMPCANC
BLD06-03283 DOC - Permit Expired5/6/20085/6/20085/6/2008 5:38:27 PMPPASS
BLD06-03012 BLD-Conference5/6/20085/6/20085/6/2008 3:03:56 PMPCANC
BLD06-03012 DOC - Permit Expired5/6/20085/6/20085/6/2008 3:03:51 PMPPASS
BLD07-03080 BLD-Framing/Rough-in5/5/20085/6/20085/6/2008 2:58:23 PMPPASS
Claudia ###-####. ok to insul.
BLD08-00063 BLD-Footing5/6/20085/6/20085/6/2008 12:54:28 PMPPASS
JERRY Phone #: ###-####. Added column pad footings in basement for additional beams.
BLD07-01957 BLD-Final5/5/20085/6/20085/6/2008 11:23:31 AMANR
kyle Phone #: ###-####. still needs life/safety final and verify elec. and plumbing finals.
BLD08-00277 BLD-Framing/Rough-in5/5/20085/6/20085/6/2008 10:23:52 AMANR
Scheduled by a contractor via Hello! on 5/5/2008 at 1:14:06 PM. Contact: ###-####. Stiil needs plumbing and mech ri insp. prior to framing insp.
BLD08-00811 BLD-Conference5/5/20085/6/20085/6/2008 10:01:25 AMADONE
STEVE NOTE: 1ST THING IN MORNING Phone #: ###-####. On site to look at house excavation. Noted to Steve that they mey need to step south footing for frost depth. Steve noted that builder is reveiwing this option at this time. Builder to make sure of coorect elevations.
BLD07-02143 BLD-Framing/Rough-in5/5/20085/6/20085/6/2008 9:59:07 AMAFAIL
ron Phone #: ###-####. Add nails to bottom chord of 2ply upstairs. Complete laydown parapets. ok to insul.