ESC08-00047
| BMP Violation | 5/6/2008 | 5/6/2008 | 5/6/2008 3:30:21 PM | P | PART |
|
|
Trash need to be put into a proper trash container and not piled infront of lot. All other issues have been addressed on the NOC. CAS #460
|
ESC08-00048
| BMP Violation | 5/6/2008 | 5/6/2008 | 5/6/2008 3:29:47 PM | P | PART |
|
|
Trash need to be put into a proper trash container and not piled infront of lot. All other issues have been addressed on the NOC. CAS #460
|
ESC08-00049
| BMP Violation | 5/6/2008 | 5/6/2008 | 5/6/2008 3:26:52 PM | P | PART |
|
|
Trash need to be put into a proper trash container and not piled infront of lot. All other issues have been addressed on the NOC. CAS #460
|
ESC08-00050
| BMP Violation | 5/6/2008 | 5/6/2008 | 5/6/2008 3:26:21 PM | P | PART |
|
|
Trash need to be put into a proper trash container and not piled infront of lot. All other issues have been addressed on the NOC. CAS #460
|
ESC08-00051
| BMP Violation | 5/6/2008 | 5/6/2008 | 5/6/2008 3:25:25 PM | P | PART |
|
|
Trash need to be put into a proper trash container and not piled infront of lot. All other issues have been addressed on the NOC. CAS #460
|
ESC08-00052
| BMP Violation | 5/6/2008 | 5/6/2008 | 5/6/2008 3:24:47 PM | P | PART |
|
|
Trash need to be put into a proper trash container and not piled infront of lot. All other issues have been address on the NOC. CAS #460
|
ESC08-00053
| BMP Violation | 5/6/2008 | 5/6/2008 | 5/6/2008 3:24:16 PM | P | PART |
|
|
Trash need to be put into a proper trash container and not piled infront of lot. All other issues have been address on the NOC. CAS #460
|
ESC08-00054
| BMP Violation | 5/6/2008 | 5/6/2008 | 5/6/2008 3:23:54 PM | P | PART |
|
|
Trash need to be put into a proper trash container and not piled infront of lot. All other issues have been address on the NOC. CAS #460
|
ESC08-00246
| Site Preparation | 5/6/2008 | 5/6/2008 | 5/6/2008 2:52:15 PM | P | FAIL |
|
|
work has not started. No bmp's inplace yet or an ESC sign. CAS #460
|
ESC07-01246
| Site Preparation | 5/6/2008 | 5/6/2008 | 5/6/2008 12:38:52 PM | P | PASS |
|
|
BMP's inplace. Have them extending there construction entrance. Sign is now posted at the corner of project and alleyway. CAS #460
|
ESC07-00824
| Site Final | 5/6/2008 | 5/6/2008 | 5/6/2008 10:41:56 AM | A | PASS |
|
|
Site has been fully landscaped. PASS CAS #460
|
ESC08-00358
| Site Final | 5/5/2008 | 5/6/2008 | 5/6/2008 10:39:15 AM | P | FAIL |
|
|
Fail. Lot is not stabilized where the demo took place. Needs to be stabilized with eith a tackifier or -3/4 rock and or pit run. Left a message with the RP over the issue of final stabilization. CAS #460
|
ESC08-00260
| Site Final | 5/5/2008 | 5/6/2008 | 5/6/2008 10:18:51 AM | P | PASS |
|
|
Work compplete. PASS #460
|
ESC08-00007
| Site Final | 5/6/2008 | 5/6/2008 | 5/6/2008 9:25:17 AM | A | PASS |
|
|
Site is stabilized. Landscaping is complete. PASS CAS #460
|
ESC07-01198
| General Inspection | 5/5/2008 | 5/6/2008 | 5/6/2008 9:20:09 AM | A | PASS |
|
|
Site looks good. No threats present. Putting road base down to get ready to lay asphalt for the interior streets. CAS #460
|
ESC07-00612
| Site Final | 5/6/2008 | 5/6/2008 | 5/6/2008 9:14:22 AM | A | PASS |
|
|
All disturbed areas have been stabilized and a perminate BMP has beens to hold back the soil (retaining wall). PASS CAS #460
|
ESC07-00612
| General Inspection | 5/5/2008 | 5/6/2008 | 5/6/2008 8:40:32 AM | A | PASS |
|
|
Site is complete. CAS #460
|
ESC07-01210
| General Inspection | 5/5/2008 | 5/6/2008 | 5/6/2008 8:38:53 AM | A | PASS |
|
|
Work is complete. All landscaping is finished CAS #460
|
ESC07-01210
| Site Final | 5/6/2008 | 5/6/2008 | 5/6/2008 8:38:10 AM | P | PASS |
|
|
All work has been completed. Site stabilized. CAS #460
|
ESC07-01316
| General Inspection | 5/5/2008 | 5/6/2008 | 5/6/2008 8:36:34 AM | A | PART |
|
|
They are into the landscaping phase. Putting in sprinkler lines. No threat seen. CAS #460
|