FIR11-00181
| INSP-Sprinkler Rough-in | 5/5/2011 | 5/6/2011 | 5/6/2011 3:14:17 PM | P | PASS |
|
|
The breezeway sprinkler piping can be covered. The dry pendant heads are to be installed later.
|
BLD10-02963
| FIRE-Conference | 5/5/2011 | 5/6/2011 | 5/6/2011 3:11:54 PM | A | DONE |
|
|
Tom and I went over fire dept access requirements for the site.
|
FIR11-00166
| INSP-Sprinkler Rough-in | 5/5/2011 | 5/6/2011 | 5/6/2011 11:57:21 AM | A | PASS |
|
|
Piping can be covered.
|
BLD11-00425
| FIRE-Final Inspection | 5/5/2011 | 5/6/2011 | 5/6/2011 11:24:30 AM | A | FAIL |
|
|
Sprinkler pendant coverage is inadequate in some areas. A separate permit will be required for this work.
|
BLD11-00621
| FIRE-Final Inspection | 5/5/2011 | 5/6/2011 | 5/6/2011 10:10:04 AM | A | PASS |
|
|
Life safety passed
|
BLD09-02180
| FIRE-Final Inspection | 5/6/2011 | 5/6/2011 | 5/6/2011 10:09:26 AM | P | PASS |
|
|
Life safety passed. I noted that two of the three exit doors had broken hardware. Per Cole the doors and hardware will be replaced this summer. Door hardware to be maintianed per IFC 1028.
|
BLD09-02034
| FIRE-Final Inspection | 5/5/2011 | 5/6/2011 | 5/6/2011 9:16:14 AM | A | PASS |
|
|
life safety passed
|