FIR12-00299
| FIR-Aging Inspection | 5/6/2014 | 5/6/2014 | 5/6/2014 4:33:47 PM | | PASS |
|
|
|
FIR12-00302
| FIR-Aging Inspection | 5/6/2014 | 5/6/2014 | 5/6/2014 4:32:29 PM | | PASS |
|
|
|
BLD13-01666
| FIRE-Conference | 5/6/2014 | 5/6/2014 | 5/6/2014 4:27:16 PM | P | DONE |
|
|
Regarding project related fire alarm work.
|
FIR14-00223
| INSP-Sprinkler Rough-in/Hydro | 5/6/2014 | 5/6/2014 | 5/6/2014 4:23:23 PM | P | PART |
|
|
Okay to cover overhead fire sprinkler work at the sheetrock soffits in the new private dining area as marked and dated on stamped plans.
|
BLD14-00107
| FIRE-Final Inspection | 5/6/2014 | 5/6/2014 | 5/6/2014 3:07:45 PM | A | NH |
|
|
Doors locked. Contact not available, appears tenant is vacating.
|
FIR13-00580
| INSP-Sprinkler Rough-in/Hydro | 5/6/2014 | 5/6/2014 | 5/6/2014 11:35:08 AM | A | PART |
|
|
Overhead rough-in to date completed okay.
|
FIR14-00121
| INSP-Sprinkler Rough-in/Hydro | 5/5/2014 | 5/6/2014 | 5/6/2014 11:34:04 AM | A | PART |
|
|
Third floor corridor and electrical room as clouded and dated on approved plans okayed for ceiling cover. Preliminary walkthrough of the some areas at the 2nd floor east side OTS and sheetrock lid locations. Discussed FDC and test header locations facing 11th street.
|
FIR14-00068
| INSP-Sprinkler Rough-in/Hydro | 5/6/2014 | 5/6/2014 | 5/6/2014 11:30:28 AM | A | PART |
|
|
Verified ductile riser, thrust block, tracer and approx. 10' stub out for the UG fire supply line east side. Need to ensure bedding per NFPA standards.
|