ESC12-00364
| General Inspection | 5/5/2014 | 5/6/2014 | 5/6/2014 4:31:38 PM | A | PASS |
|
|
WIP. Exisiting vegetation at lot provides buffer from disturbance. Mainly interior work remaining. No corrections at this time.
|
ESC13-00520
| General Inspection | 5/6/2014 | 5/6/2014 | 5/6/2014 3:34:21 PM | | PASS |
|
|
|
ESC13-01040
| General Inspection | 5/6/2014 | 5/6/2014 | 5/6/2014 11:25:01 AM | | PASS |
|
|
Roofers and framers on site. Contractors staying off open areas. No violations observed.
|
ESC13-00144
| General Inspection | 5/6/2014 | 5/6/2014 | 5/6/2014 11:01:55 AM | | PASS |
|
|
No changes or construction acitivity. River rock and dirts stockpiles are still on site. Though no vegetation on future road site above trunk line, there does not seem to be any dust generated on this windy day. Will continue to monitor.
|
ESC13-00755
| General Inspection | 5/6/2014 | 5/6/2014 | 5/6/2014 10:47:36 AM | P | PASS |
|
|
Follow up inspection to see if action items from the 5/1 conference were completed.
Both entrances have new rock that is also extended. Very little sediment accumulation in gutters along Lysted. West entrance on Council Springs does not have any significant track out.
Site conditions are much improved. Need to check if DI on north side of Warm Springs between Council Springs and Eckert. Lots of sediment in gutters, unclear if it is from Terraces project trackout in preveious weeks - numerous projects are in the vicinity. Will follow up. No corrections at this time.
|
ESC13-00975
| General Inspection | 5/6/2014 | 5/6/2014 | 5/6/2014 10:35:50 AM | | PASS |
|
|
No discharges or sediment runoff to the stormwater swales. Swales have ring of grassy vegetation around the infiltration rocks. Workers onsite. No corrections at this time.
|
ESC13-00951
| General Inspection | 5/6/2014 | 5/6/2014 | 5/6/2014 10:34:21 AM | | PASS |
|
|
No activity at time of inspection. Frame of townhome is erected, but interior work remains. Millet access road is clean.
|
ESC13-00684
| General Inspection | 5/6/2014 | 5/6/2014 | 5/6/2014 10:18:28 AM | | PASS |
|
|
Installing curb along side Warm Springs. Large lined washout pit is provided on the upper staging area for the work. Road into development has been compacted, looks like it will soon be paved. Site has good vegetative and structural buffer. No corrections at this time.
|
ESC14-00341
| Site Preparation | 5/5/2014 | 5/6/2014 | 5/6/2014 10:04:41 AM | A | PASS |
|
|
John Phone #: ###-####
Permit posted. Excavation is downslope from the Boise City Canal, which is lined with stone bricks and and also a landscaped buffer. GC Jon King explained the scope of project. Will use small tractor to haul dirt down from top of driveway at Warm Springs. Approved for construction.
|
ESC13-00854
| General Inspection | 5/6/2014 | 5/6/2014 | 5/6/2014 9:04:35 AM | | PASS |
|
|
No construction or disturbance at site. Will check with Knife River to see if project is complete. No activity on attached BLD permit.
|
ESC13-00655
| General Inspection | 5/6/2014 | 5/6/2014 | 5/6/2014 8:44:45 AM | | PASS |
|
|
|