Inspections for the day of: Wednesday, May 6, 2015.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-03504 FIRE-Final Inspection5/6/20155/6/20155/6/2015 3:21:57 PMPPASS
life safety passed
FIR15-00058 INSP-Final Inspection5/6/20155/6/20155/6/2015 3:20:52 PMPPASS
permit finaled
FIR15-00173 INSP-Sprinkler Rough-in5/6/20155/6/20155/6/2015 3:01:19 PMPPART
All piping can be covered except where the new and modified soffits have been installed. These areas need to have fire protection or meet an exception
BLD14-03579 FIRE-Final Inspection5/4/20155/6/20155/6/2015 2:53:48 PMPPASS
fire/life safety passed. The two exit discharge lights and two emergency can lights to be repaired prior to a building inspection sign off. Also provide verification to the building inspector that the thumbturn deadbolts provided on the restroom doors meets ADA
FIR15-00224 INSP-Sprinkler Rough-in5/6/20155/6/20155/6/2015 1:50:39 PMPPASS
Rough-in passed. Piping can be covered.
FIR15-00302 INSP-Final Inspection5/5/20155/6/20155/6/2015 1:47:50 PMAPASS
Permit finaled
FIR14-00460 INSP-Final Inspection5/6/20155/6/20155/6/2015 1:28:02 PMPPASS
Final previously performed with Tim Frost.
FIR14-00762 INSP-Sprinkler Rough-in5/5/20155/6/20155/6/2015 12:27:46 PMAPASS
Piping rough-in and tenting inspection passed. Piping can be covered.
FIR14-00902 INSP-Final Inspection5/5/20155/6/20155/6/2015 10:51:24 AMAPASS
Permit finaled
BLD14-03516 FIRE-Final Inspection5/5/20155/6/20155/6/2015 10:06:53 AMAPASS
life safety passed
NAF15-00006 INSP-Sprinkler Rough-in/Hydro5/5/20155/6/20155/6/2015 9:12:09 AMAFAIL
First floor hydro test failed due to visible loss on guage.
NAF14-00028 INSP-Sprinkler Rough-in/Hydro5/5/20155/6/20155/6/2015 9:10:12 AMAFAIL
Hydro Underground failded due to visible leak at guage
BLD15-01028 FIRE-Final Inspection5/5/20155/6/20155/6/2015 8:10:18 AMAPASS
Life safety passed. Single action hardware to be installed prior to the building inspection
BLD15-00261 FIRE-Final Inspection5/5/20155/6/20155/6/2015 8:01:06 AMPCANC
No life safety sign off required.
FIR15-00301 INSP-Sprinkler Rough-in/Hydro5/5/20155/6/20155/5/2015 2:19:08 PMPCANC
Call prior to going Phone #: 2089414511 >> Inspection requested via mobile web by Nathan Price Inspection cancelled via mobile web on Tuesday, May 05, 2015.