FIR15-00588
| INSP-Sprinkler Rough-in | 5/5/2016 | 5/6/2016 | 5/6/2016 4:10:39 PM | A | CANC |
|
|
Rough to cover inspection cannot be completed at this time. Fire sprinkler plans may need to be resubmitted/approved, until this is finalized, no area's can be covered. This inspection request cancelled.
|
FIR16-00227
| INSP-Sprinkler Rough-in/Hydro | 5/6/2016 | 5/6/2016 | 5/6/2016 12:55:04 PM | P | PASS |
|
|
Hydrostatic test complete for overhead wet system in northeast 50 degree cooler, hydrostatic test complete for dry system located northwest 38 degree cooler.
|
FIR16-00017
| INSP-Sprinkler Rough-in/Hydro | 5/5/2016 | 5/6/2016 | 5/6/2016 10:54:32 AM | A | PART |
|
|
Rough to cover inspection complete, 1st level overhead fire sprinkler piping approved for cover with exception to the fire sprinkler piping crossing the breeze-way, the piping crossing the breeze-way an all floors cannot be covered until an approved method is installed to keep this section of piping from freezing. 2nd level overhead fire sprinkler piping approved for cover with exception to breeze-way, 3rd level piping approved for cover will exception to breeze-way and piping that is located in attic space, the piping in th attic space needs to be tented with insulation, once tenting inspection is complete this piping can be covered, 4th level rough in inspection complete, all piping on 4th level cannot be covered until tenting inspection is complete. Any overhead fire sprinkler piping that is covered before tenting inspection will have covering material removed for the inspection.
|
FIR16-00049
| INSP-Sprinkler Rough-in/Hydro | 5/5/2016 | 5/6/2016 | 5/6/2016 10:48:03 AM | A | PASS |
|
|
Overhead 200 psi hydrostatic test complete. Rough in inspection will be scheduled when seismic bracing/end of line restraints are complete.
|
FIR15-00329
| INSP-Supply line flush | 5/4/2016 | 5/6/2016 | 5/6/2016 5:37:23 AM | A | PASS |
|
|
Underfround flush for underground supply piping complete for both underground supplies.
|