ESC12-00403
| General Inspection | 5/6/2016 | 5/6/2016 | 5/6/2016 4:16:24 PM | | PASS |
|
|
WIP on SWQ portion of project. JUMP staging areas and courtyard still being utilized for construction needs. No significant trackout obsevrved, no spills or dishcarges originating from site. MS4 inlets have sediment filter bags received. No complaints received.
No corrections issued.
|
ESC15-00701
| General Inspection | 5/6/2016 | 5/6/2016 | 5/6/2016 3:37:18 PM | | PASS |
|
|
Warehouse and garage addition complete. Parking lot and landscaping installed/stabilized. All permits finaled, ESC permit conditions satisfied.
|
ESC15-00701
| DOC - Permit Finaled | 5/6/2016 | 5/6/2016 | 5/6/2016 3:36:40 PM | P | PASS |
|
|
|
ESC15-01490
| DOC - Permit Finaled | 5/6/2016 | 5/6/2016 | 5/6/2016 2:49:49 PM | P | PASS |
|
|
Remodel/addition is complete. All permits finaled. No ESC issues
|
ESC15-01232
| Site Final | 5/6/2016 | 5/6/2016 | 5/6/2016 2:45:34 PM | P | NR |
|
|
Construction complete. Need to remove DI bags on Broadway and Linden.
VM left with RP Kenny.
Note - closed out other permit related to project ESC15-01310
|
ESC15-01310
| DOC - Permit Finaled | 5/6/2016 | 5/6/2016 | 5/6/2016 2:34:50 PM | P | PASS |
|
|
|
ESC15-01179
| Aging Inspection | 5/6/2016 | 5/6/2016 | 5/6/2016 2:18:43 PM | | PASS |
|
|
No trackout, no discharges, no other violations. Permit sign posted.
|
ESC15-01532
| General Inspection | 5/6/2016 | 5/6/2016 | 5/6/2016 1:06:07 PM | P | PASS |
|
|
WIP on path paving. Silt fence that was overtake by high water has been removed. Inlets around Fairview/Main and sediment filter protection. No trackout. No violations observed.
|
ESC15-00015
| General Inspection | 5/2/2016 | 5/6/2016 | 5/6/2016 1:01:33 PM | A | PASS |
|
|
|
ESC04-00131
| DOC - Permit Finaled | 5/6/2016 | 5/6/2016 | 5/6/2016 11:37:04 AM | P | PASS |
|
|
old expired permit in system. no inspection
|
ESC04-00948
| DOC - Permit Finaled | 5/6/2016 | 5/6/2016 | 5/6/2016 11:36:48 AM | P | PASS |
|
|
old expired permit in system. no inspection
|
ESC04-00887
| DOC - Permit Finaled | 5/6/2016 | 5/6/2016 | 5/6/2016 11:36:36 AM | P | PASS |
|
|
old expired permit in system. no inspection
|
ESC15-00664
| DOC - Permit Finaled | 5/6/2016 | 5/6/2016 | 5/6/2016 11:34:37 AM | P | PASS |
|
|
No construction activity or disturbed area at site.
|
ESC15-01204
| Aging Inspection | 5/6/2016 | 5/6/2016 | 5/6/2016 11:33:43 AM | | PASS |
|
|
|
ESC15-00691
| General Inspection | 5/6/2016 | 5/6/2016 | 5/6/2016 11:18:25 AM | | PASS |
|
|
WIP on interior. Condo frames and exterior are complete. No trackkout from site, storm drains that capture runoff have sediment filter bags installed. Trash contained. ESC permit signs posted on job trailer.
|
ESC15-00690
| General Inspection | 5/6/2016 | 5/6/2016 | 5/6/2016 11:18:14 AM | | PASS |
|
|
WIP on interior. Condo frames and exterior are complete. No trackkout from site, storm drains that capture runoff have sediment filter bags installed. Trash contained. ESC permit signs posted on job trailer.
|
ESC15-00689
| General Inspection | 5/6/2016 | 5/6/2016 | 5/6/2016 11:18:00 AM | | PASS |
|
|
WIP on interior. Condo frames and exterior are complete. No trackkout from site, storm drains that capture runoff have sediment filter bags installed. Trash contained. ESC permit signs posted on job trailer.
|
ESC15-00688
| General Inspection | 5/6/2016 | 5/6/2016 | 5/6/2016 11:17:47 AM | | PASS |
|
|
WIP on interior. Condo frames and exterior are complete. No trackkout from site, storm drains that capture runoff have sediment filter bags installed. Trash contained. ESC permit signs posted on job trailer.
|
ESC14-00989
| General Inspection | 5/6/2016 | 5/6/2016 | 5/6/2016 9:54:20 AM | | PASS |
|
|
|
ESC15-00931
| General Inspection | 5/6/2016 | 5/6/2016 | 5/6/2016 9:14:14 AM | | PASS |
|
|
WIP. 3 homes in Tianna Park remaining. Once complete street sweeping and DI bag removal shall be required. No corrections needed at this time.
|
ESC15-01234
| Aging Inspection | 5/6/2016 | 5/6/2016 | 5/6/2016 8:56:29 AM | | PASS |
|
|
Near completion. Yard needs landscaping and final site clean up. Tahoe RP had the wind blown litter from job sites in Warm Springs Creek picked up as requested. Subdivision BMPs installed.
|