BLD19-03326
| BLD-Final | 5/6/2020 | 5/6/2020 | 5/6/2020 4:57:26 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD19-03326
| DOC - Permit Finaled | 5/6/2020 | 5/6/2020 | 5/6/2020 4:57:15 PM | P | PASS |
|
|
|
BLD19-03326
| BLD-Blower Door Test Results | 5/6/2020 | 5/6/2020 | 5/6/2020 4:57:00 PM | P | DONE |
|
|
ACH50- 4
|
BLD20-00222
| BLD-Energy code compliance | 5/6/2020 | 5/6/2020 | 5/6/2020 4:56:28 PM | P | PASS |
|
|
Corrections SAT...
|
BLD19-04462
| BLD-Foundation | 5/5/2020 | 5/6/2020 | 5/6/2020 4:56:09 PM | P | PASS |
|
|
Work in progress...
|
BLD19-03999
| BLD-Framing/Rough-in | 5/6/2020 | 5/6/2020 | 5/6/2020 4:55:47 PM | P | FAIL |
|
|
Drag trusses, and drag straps to be as per plans, provide Engineering approval for as built or revised Engineering... Install 6x6 per plans or Engineering approval for as built... Per plans, interior shear walls to be blocked at edges... OK to insulate...
|
BLD19-03548
| BLD-Energy code compliance | 5/5/2020 | 5/6/2020 | 5/6/2020 11:52:29 AM | A | PASS |
|
|
Les *Screened* Phone #: ###-####
|
BLD19-04918
| BLD-Framing/Rough-in | 5/5/2020 | 5/6/2020 | 5/6/2020 11:52:18 AM | A | PART |
|
|
Pending trades, ok tocover one side only...
|
BLD19-03460
| BLD-Energy code compliance | 4/29/2020 | 5/6/2020 | 5/6/2020 11:51:38 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD19-00363
| BLD-Framing/Rough-in | 5/5/2020 | 5/6/2020 | 5/6/2020 11:51:25 AM | A | PASS |
|
|
Herb Phone #: ###-####
|
BLD18-04456
| BLD-Aging Inspection | 5/6/2020 | 5/6/2020 | 5/6/2020 8:32:55 AM | | DEFR |
|
|
Work in progress
|
BLD19-04095
| DOC - Permit Finaled | 5/6/2020 | 5/6/2020 | 5/6/2020 8:29:13 AM | P | PASS |
|
|
|
BLD19-04095
| BLD-Blower Door Test Results | 5/6/2020 | 5/6/2020 | 5/6/2020 8:28:57 AM | A | DONE |
|
|
ACH50- 3.89
|