BLD01-00309
| BLD-Footing | 5/4/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | A | PASS |
|
|
Jerry ###-#### ext footing ok also MTI will be performing inspections. 12/7/2001 10:49:20 AM
|
BLD01-00290
| BLD-Footing | 5/4/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | A | PASS |
|
|
###-#### ok ext footings,also insp will be performed by MTI. 12/7/2001 10:48:44 AM
|
BLD00-02474
| BLD-Framing/Rough-in | 5/4/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | A | PART |
|
|
handrail ted ###-#### laft stairway at front face has cooetions,also left ramp req handrails or architect to submit. 12/7/2001 12:01:23 PM
|
BLD00-02809
| BLD-Framing/Rough-in | 5/4/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | A | PART |
|
|
john ###-#### 2/7/2001 12:00:19 PM 12/7/2001 12:00:30 PM ok to insulate need to firestop walls at floor lines. 12/7/2001 1:35:35 PM
|
BLD01-00909
| BLD-Foundation | 5/7/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | P | PART |
|
|
###-####
|
BLD01-00978
| BLD-Final | 5/7/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | P | PASS |
|
|
Shane ###-####ok perm oc 12/7/2001 5:43:36 PM
|
BLD00-01979
| BLD-Final | 5/7/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | P | PASS |
|
|
shane ###-####ok perm oc. 12/7/2001 5:44:04 PM
|
BLD01-01062
| BLD-Final | 5/7/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | P | PASS |
|
|
###-#### john walker
|