Inspections for the day of: Monday, May 7, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Arcoraci
TitleBLD-COM/RES INSPECTOR
Phone #794-9368
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01178 BLD-Final5/4/20015/7/20015/7/2001 12:00:00 AMANR
fn --re-roof not done at this time 5/7/2001 9:31:09 AM
BLD01-00552 BLD-Final5/4/20015/7/20015/7/2001 12:00:00 AMAPASS
###-#### Johnny Walker ok for perm occ 5/7/2001 10:35:25 AM
BLD01-00883 BLD-Framing/Rough-in5/4/20015/7/20015/7/2001 12:00:00 AMAPART
Greg ###-#### check grid for light fixture attachment 5/7/2001 9:49:22 AM
BLD01-01030 BLD-Framing/Rough-in5/4/20015/7/20015/7/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 05/04/2001 at 16:13:48. Contact: ###-####. ok to cover int walls 5/7/2001 10:09:06 AM
BLD01-00743 BLD-Final5/5/20015/7/20015/7/2001 12:00:00 AMANR
Scheduled by a contractor via Hello! on 05/05/2001 at 10:52:35. Contact: ###-####. needs smoke installed 5/7/2001 9:25:56 AM
BLD00-02976 BLD-Framing/Rough-in5/7/20015/7/20015/7/2001 12:00:00 AMPPASS
Darrell ###-####
BLD00-02976 BLD-Framing/Rough-in5/7/20015/7/20015/7/2001 12:00:00 AMPPASS
Joann ###-####
BLD00-03475 BLD-Framing/Rough-in5/7/20015/7/20015/7/2001 12:00:00 AMPNR
Joanne ###-####
BLD01-00142 BLD-Final5/7/20015/7/20015/7/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 05/07/2001 at 09:25:33. Contact: ###-####.
BLD00-02268 BLD-Framing/Rough-in5/7/20015/7/20015/7/2001 12:00:00 AMPPART
shear wall \\###-#### ok to rock ext first floor 5/7/2001 5:29:58 PM
BLD00-02296 BLD-Footing5/4/20015/7/20015/7/2001 12:00:00 AMPPASS
interior footings Jeff ###-####