BLD01-00798
| BLD-Framing/Rough-in | 5/4/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | A | PART |
|
|
ok to insulate, strap and nail per eng. in dining 5/7/2001 12:01:17 PM
|
BLD01-00896
| BLD-Footing | 5/4/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | A | PART |
|
|
he wants 9:00am if possible\\###-####
no plans, verbal corrections, pour at own risk 5/7/2001 10:34:49 AM
|
BLD00-03659
| BLD-Framing/Rough-in | 5/4/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | A | CANC |
|
|
Bob ###-####
wants carl to do 5/7/2001 11:08:09 AM
|
BLD00-03414
| BLD-Footing | 5/4/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | A | PART |
|
|
Robert ###-#### late am please
veral corrections, depth of ftgs 5/7/2001 11:02:25 AM
|
BLD01-00171
| BLD-Conference | 5/7/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | A | PASS |
|
|
met w/ dixie and heating contractor on area seperation wall and other items 5/7/2001 10:02:51 AM
|
BLD01-00743
| BLD-Final | 5/7/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/07/2001 at 10:09:51. Contact: ###-####.
|
BLD01-00171
| BLD-Foundation | 5/7/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/07/2001 at 10:56:42. Contact: ###-####.
pending s. i. tests 5/7/2001 3:34:31 PM
|
BLD01-01168
| BLD-Footing | 5/7/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/07/2001 at 08:41:21. Contact: ###-####.wip, verbal corrections, ok after fixes to pour 5/7/2001 2:51:16 PM
|
BLD00-02996
| BLD-Final | 5/7/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | P | FAIL |
|
|
###-####
c/n posted 5/7/2001 2:23:43 PM
|
BLD00-03319
| BLD-Framing/Rough-in | 5/4/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | P | PART |
|
|
nailing on the shear panel Mark ###-####
ext. shear ok 5/7/2001 1:42:51 PM
|