BLD01-00498
| BLD-Framing/Rough-in | 5/4/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | A | FAIL |
|
|
exterioor shear panel matt ###-#### C/N issued. 5/7/2001 11:49:04 AM
|
BLD01-00371
| BLD-Framing/Rough-in | 5/4/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | A | FAIL |
|
|
marshall ###-#### fr C/N issued--Need correct truss package, draftstop at upstairs bath, truss repair (FA3) per engineering. 5/7/2001 11:01:40 AM
|
BLD00-03728
| BLD-Framing/Rough-in | 5/4/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | A | PART |
|
|
###-#### C/n issued-ok to insulate 5/7/2001 9:53:53 AM
|
BLD00-01666
| BLD-Final | 5/4/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/04/2001 at 11:36:03. Contact: ###-####. C/n issued--handrail off deck & guardrail needs additional fastening to strenghten. 5/7/2001 8:27:02 AM
|
BLD01-00751
| BLD-Framing/Rough-in | 5/4/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | P | CANC |
|
|
Jack ###-#### Cancelled by contractor 5/7/2001 1:09:56 PM
|
BLD97-00878
| BLD-Final | 5/7/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | P | PASS |
|
|
###-#### Conference not final 5/7/2001 12:35:15 PM
|
BLD01-00226
| BLD-Framing/Rough-in | 5/7/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/07/2001 at 08:39:27. Contact: ###-####. C/N posted on site. 5/7/2001 2:03:39 PM
|
BLD01-00994
| BLD-Foundation | 5/7/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/07/2001 at 08:59:30. Contact: ###-####. Partial already poured 5/7/2001 2:44:01 PM
|
BLD01-00409
| BLD-Energy code compliance | 5/7/2001 | 5/7/2001 | 5/7/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/07/2001 at 11:08:26. Contact: ###-####. C/N on framing sticker--ok to cover--prior c/n items completed--need energy prior to issuance of c. of c. 5/7/2001 3:19:39 PM
|