PLM01-02494
| Final | 5/6/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | A | NR |
|
|
###-#### dan not ready will recall when ready 5/7/2002 11:06:22 AM
|
PLM01-03901
| Plumbing Rough-in | 5/6/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/06/2002 at 13:28:16. Contact: ###-####.
|
PLM02-01256
| Water and/or Sewer | 5/6/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | A | PASS |
|
|
###-#### STEVE
|
PLM02-01264
| Water and/or Sewer | 5/7/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | P | PASS |
|
|
###-#### SANDY
|
PLM02-01227
| Plumbing Rough-in | 5/7/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/07/2002 at 08:20:26. Contact: ###-####. need to vent new shower trap repipe existing down stair,s vents. provide two inch drain for washing machine, nail plate. 5/7/2002 4:50:28 PM
|
PLM02-01272
| Plumbing Rough-in | 5/7/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | P | NR |
|
|
###-#### MARVE not ready 5/7/2002 3:18:10 PM
|
PLM02-01273
| Plumbing Rough-in | 5/7/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | P | PART |
|
|
r/i ediger ###-#### 5/7/2002 5:34:45 PM rough plumbing ok to cover need to install premis protection befor final 5/7/2002 5:37:33 PM
|
PLM02-01275
| Water and/or Sewer | 5/7/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | P | PART |
|
|
SEWER ONLY ###-#### JEFF need additional clean-out installed off corner of house on east side contractor to recall when ready 5/7/2002 3:56:02 PM
|
PLM02-00304
| Final | 5/7/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | P | PART |
|
|
mait- ###-#### 5/8/2002 5:14:45 PM may require additional cross control protection 5/8/2002 5:51:08 PM
|
PLM02-00655
| Final | 5/7/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | P | PART |
|
|
mait- ###-#### fn may require additional cross control protection 5/8/2002 5:52:16 PM
|