FIR02-00125
| INSP-Final Inspection | 5/6/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | A | PASS |
|
|
fire fn -robert ###-####
|
BLD02-00331
| FIRE-Final Inspection | 5/6/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | A | FAIL |
|
|
fire fn -monte- ###-#### called Jason Blais and Jim Storey about this project. Jason said all of the items on the permit are required and he hasn't received any racking permits; need exit signs and lever hardware as shown on the plans; need racking permit 5/7/2002 9:03:14 AM
|
BLD02-00273
| FIRE-Final Inspection | 5/6/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | P | PASS |
|
|
MARK ###-#### FIRE FN
|
FIR02-00163
| INSP-Sprinkler Rough-in/Hydro | 5/7/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | P | PART |
|
|
###-#### BRYAN okat to cover; hydro okay also; one head by east hall coated with texture; wrong heads installed in rear storage area but have same K factor; alarms not complete 5/7/2002 3:45:31 PM
|
FIR01-00462
| INSP-Sprinkler Rough-in | 5/7/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | P | PART |
|
|
mike ###-#### r/i main sanctuary heads okay to cover; see full list of areas to cover in Bruce's inspection log book 5/7/2002 2:47:10 PM
|