BLD01-02399
| BLD-Framing/Rough-in | 5/6/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/06/2002 at 11:19:24. Contact: ###-####. shear at front entry roof sheeting front entry framing onnorth and front entry ok 5/7/2002 12:06:14 PM
|
BLD01-02963
| BLD-Foundation | 5/6/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | A | PASS |
|
|
###-#### BRENT
|
BLD02-00196
| BLD-Framing/Rough-in | 5/6/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | A | CANC |
|
|
###-#### RICK
|
BLD02-00687
| BLD-Footing | 5/6/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/06/2002 at 17:58:40. Contact: ###-####. holes are dug and formed rebar on site crew will start tieing after lunch column pads for canapy 5/7/2002 1:52:05 PM
|
BLD02-01052
| BLD-Framing/Rough-in | 5/7/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | P | PASS |
|
|
###-#### phil
|
BLD02-00340
| BLD-Framing/Rough-in | 5/7/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | P | PART |
|
|
###-#### MIKE front entry way ok to cover 5/7/2002 1:57:47 PM
|
BLD02-00995
| BLD-Footing | 5/7/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | P | PASS |
|
|
###-#### RANDY
|
BLD02-00831
| BLD-Framing/Rough-in | 5/7/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | P | FAIL |
|
|
###-#### ERNIE needs to fix hand rail 5/7/2002 3:24:22 PM
|
MIS02-00115
| BLD-Final | 5/6/2002 | 5/7/2002 | 5/7/2002 12:00:00 AM | P | DONE |
|
|
PAUL OR MARGARET ###-#### I have explained to the homeowner that the PM is a 4 hour window.
**Please make a note for the inspector to leave the inspection with the homeowner or drop off at 1025 S Capitol Blvd.
|