Inspections for the day of: Wednesday, May 7, 2003.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00369 BLD-Framing/Rough-in5/5/20035/7/20035/7/2003 12:00:00 AMACANC
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD02-00370 BLD-Framing/Rough-in5/5/20035/7/20035/7/2003 12:00:00 AMAPART
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...4hr walls, extend to/thru corridor 5/7/2003 4:07:49 PM
BLD02-00371 BLD-Framing/Rough-in5/5/20035/7/20035/7/2003 12:00:00 AMAPART
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...4hr wall, rec'd eng's "ok" for ISI's eng'd design for framing. 5/7/2003 4:21:05 PM
BLD02-00372 BLD-Framing/Rough-in5/5/20035/7/20035/7/2003 12:00:00 AMAPART
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 4hr wall thru to 3rd fl; rec'd eng's ok for framing design. 5/7/2003 4:22:12 PM
BLD02-00373 BLD-Framing/Rough-in5/5/20035/7/20035/7/2003 12:00:00 AMAPART
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...rec'd eng's ok for ISI's eng'd design of 4hr wall framing...wip ok, extend to/thru corridors as req'd. 5/7/2003 5:00:40 PM
BLD02-00374 BLD-Framing/Rough-in5/5/20035/7/20035/7/2003 12:00:00 AMAPART
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore, 4hr wall, wip; rec'd engs ok for framing design. 5/7/2003 5:06:04 PM
BLD02-00375 BLD-Framing/Rough-in5/5/20035/7/20035/7/2003 12:00:00 AMACANC
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
MIS03-00086 BLD-Conference5/6/20035/7/20035/7/2003 12:00:00 AMAPASS
spoke w/ owner...Vernon Smith, will obtain permit for new windows & misc. work...complaintant not onsite, condition noted at apt#5 was/is minor repair due to auto accident (patch back wall, work completed?) 5/7/2003 9:16:37 AM
BLD03-00957 BLD-Final5/7/20035/7/20035/7/2003 12:00:00 AMPPART
###-#### ###-#### ventalation ok roof in place unable to confrim roof assembly aplaction. 5/7/2003 2:41:51 PM
BLD02-00369 BLD-Framing/Rough-in5/7/20035/7/20035/7/2003 12:00:00 AMPPART
prelim only; may delete joist bridging if ok by eng'r bridging 5/7/2003 4:03:40 PM
BLD02-00375 BLD-Framing/Rough-in5/7/20035/7/20035/7/2003 12:00:00 AMPPART
4hr wall, wip ok. to 3rd level 5/7/2003 4:05:39 PM .. 5/7/2003 4:05:44 PM
BLD03-00819 BLD-Footing5/7/20035/7/20035/7/2003 12:00:00 AMPPART
CHUCK; Phone #: ###-#### Internet Inspection Request from: Darla Downs...ftgs ok, adding last bar at ftg 5/7/2003 4:52:38 PM
BLD02-00199 BLD-Footing4/30/20035/7/20035/7/2003 12:00:00 AMPPART
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore; wip 5/7/2003 3:08:43 PM
BLD02-00199 BLD-Foundation4/30/20035/7/20035/7/2003 12:00:00 AMPPART
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore wip, mti onsite
5/7/2003 3:09:33 PM